12 Chapter IV Device Installation
4.5
Cabinet installation
After the cabinet is removed to the installation position with a forklift or a tool. Fine adjust the cabinet and remove
it to the designed position, open the internal door of cabinet, use M13 screw to fix the cabinet, as shown in Fig.4-4.
Fig.4-4. Diagram for cabinet base
When the cabinet needs to be fixed on the steel channel, Φ14 holes can be made in the steel channel. Fix the
cabinet to the steel channel with screws, as shown in Fig.4-5.
Fig. 4-5 Fix the cabinet to the steel channel Fig.4-6 Fix the cabinet to the concrete floor
When the cabinet is fixed to the concrete floor, make holes on the floor and fix the cabinet to the concrete floor with
expansion screws, as shown in Fig.4-6.
cable
groove
Ground
Foot screw
Front side of cabinet
8-14X24 waist hole
Cable
groove
Fixed screw
Channel
steel
Содержание PWG2-100K
Страница 1: ...User s Manual PWG2 50K 100K EX Bi directional Hybrid Storage Inverter ...
Страница 2: ......
Страница 4: ......
Страница 12: ...prevail ...
Страница 33: ...Chapter V Commissioning and Operation 21 warning label on module case surface ...
Страница 49: ...Installation Records ...