background image

8

Alpha 500E - General Boiler Information

The flue terminal must be exposed to the external air and the position must allow the free passage of air across it at all times.
In certain weather conditions the terminal may emit a plume of steam. Avoid positioning the terminal where this may cause a nuisance.

If the terminal is fitted within 850 mm of a plastic or painted gutter or 450 mm of painted eaves, an aluminium shield at least 1 m
long should be fitted to the underside of the gutter or painted surface. If the terminal is fitted less than 2 m above a surface to
which people have access, the terminal must be protected by a terminal guard.
A suitable guard (type K3 - G.C. No. 393 554) is available from:
Alpha Therm Ltd., Goldsel Road, Swanley, Kent BR8 8EX, or Tower Flue Components Ltd., Vale Rise, Tonbridge, Kent TN9 1TB

3.6

BOILER LOCATION

The boiler is not suitable for external installation.

The boiler must be installed on a flat vertical wall which is capable of supporting the weight of the boiler, i.e. 130 kg.

If the boiler is to be fitted in a timber framed building, it should be fitted in accordance with the British Gas publication 'Guide for
Gas Installations in Timber Frame Housing', reference DM2.

The boiler may be installed in any room or internal space, although particular attention is drawn to the requirements of the current IEE Wiring
Regulations, and in Scotland, the electrical provisions of the Building Regulations applicable in Scotland, with respect to the installation of
the boiler in a room or internal space containing a bath or shower. Where a room-sealed boiler is installed in a room containing a bath or
shower, it must not be possible for a person using the bath or shower to touch any electrical switch or boiler control utilising mains electricity.

The boiler may be installed in a cupboard or compartment, provided it is correctly designed and sufficiently ventilated for that
purpose and that the requirements of BS 6798 and BS 5440:2 are complied with.

3.5

FLUE TERMINAL LOCATION - Fig. 4

A

Directly below an opening, air brick, windows, etc.

B

Below gutters, soil pipes or drain pipes

C

Below eaves

D

Below balconies or car port roof

E

From a vertical drain pipe or soil pipe

F

From an internal or external corner

G

Above ground, roof or balcony level

H

From a surface facing the terminal

I

From a terminal facing the terminal

J

From an opening in the car port (e.g. door, window) into dwelling

K

Vertically from a terminal on the same wall

L

Horizontally from a terminal on the same wall

300 mm

75 mm

25 mm

25 mm

25 mm

25 mm

300 mm

600 mm

1200 mm

1200 mm

1500 mm

300 mm

Min. distance

Terminal position

Fig. 4

Содержание Alpha 500E

Страница 1: ...ll Mounted Fan Assisted Room Sealed Gas Fired Combination Boiler with Unvented Hot Water Storage Alpha 500E G C No 47 532 07 HEJEID I Service Listed 0051 Goldsel Road Swanley Kent BR8 8EX Fax 01322 61...

Страница 2: ...with the following recommendations Gas Safety Installation and Use Regulations 1984 as amended All relevant Building Regulations issued by the Department of the Environment Building Standards Scotlan...

Страница 3: ...ansion Vessel Size pre charge press Flow Connection Return Connection Relief Valve Connection Recommended System Pressure cold 2 5 bar 0 5 bar 82 C 3 bar 44 PSI 7 5 L at 0 8 bar 22 mm 22 mm 15 mm 1 0...

Страница 4: ...00 60 000 50 000 40 000 35 495 metres 1 0 2 2 3 6 4 2 4 8 5 0 feet 3 28 7 22 11 8 13 7 15 7 16 4 Output Available pump head metres 2 1 3 4 4 2 4 6 5 1 5 3 feet 6 9 11 1 13 7 15 1 16 7 17 3 metres 3 5...

Страница 5: ...ressure Relief Valve 14 Auto Air Vent 15 Main Burner 16 Main Heat Exchanger 17 Fan 18 Air pressure Switch 19 Unvented Kit 20 C H Expansion Vessel 21 Storage Cylinder 22 Temperature Pressure Relief Val...

Страница 6: ...w at least 75 mm clearance between the front of the boiler and the door for air movement 3 4 FLUE SYSTEM Fig 3 The flue system must be installed in accordance with BS 5440 1 The flue assembly supplied...

Страница 7: ...H side flue X 380 for R H side flue X 130 VERTICAL FLUE OPTIONS Hmax 4 metres L B E F X mm 90 bend 1 metre L B C X mm 2 x 45 bends 1 metre L B C E X mm L B C X mm Front Front RHS LHS C B E C B E B F B...

Страница 8: ...erence DM2 Theboilermaybeinstalledinanyroomorinternalspace althoughparticularattentionisdrawntotherequirementsofthecurrentIEEWiring Regulations and in Scotland the electrical provisions of the Buildin...

Страница 9: ...he system design pressure cold should be set to 1 0 bar This pressure is equivalent to the maximum static head see Fig 5 of 10 2 metres of water Provision should be made to replace water lost from the...

Страница 10: ...ENTED HOT WATER STORAGE SYSTEM To comply with the Building Regulations for unvented hot water storage it is required that the components detailed in Fig 8 are fitted before the mains cold water inlet...

Страница 11: ...discharges from safety devices may not be apparent i e in dwellings occupied by blind infirm or disabled people consideration should be given to the installation of an electronically operated device t...

Страница 12: ...ing into account the clearances required for servicing and the flue terminal position 2 Tape the template to the wall ensure it is level and the right way up and mark the position of the holes for the...

Страница 13: ...3 9 4 6 CONNECT THE PIPEWORK Fig 13 1 Thoroughly flush out all the water pipework Ensure that all the plastic caps are removed from the boiler connections 2 Secure all the valves fittings to the boile...

Страница 14: ...into the outer duct 9 Pass the flue assembly through the wall from inside or outside Note Internal fitting If there is no access to make good the outside wall locate and secure the flue sealing colla...

Страница 15: ...de wall to the side of the boiler a mm Inner flue duct length finished wall thickness the distance from the inside wall to the side of the boiler b mm Note L H side a 300 b 377 R H side a 50 b 127 5 W...

Страница 16: ...f an external control i e room thermostat or external clock is to be fitted remove the terminal block cover and remove the link between terminals 1 and 2 Pass the cable through the cable clamp through...

Страница 17: ...ssary Disconnect the filling loop from the mains supply Water may be released from the system by manually venting a radiator until the system design pressure is obtained The system design pressure col...

Страница 18: ...H thermostat to maximum 2 The burner will light at the factory pre set maximum output 3 Set the selector switch to 0 to turn off the boiler Disconnect the pressure gauge and tighten the test point scr...

Страница 19: ...here is a call for central heating the diverter valve is operated the pump will start to circulate the primary heating water operating the flow switch The fan will run at full speed once the air press...

Страница 20: ...tually happening 6 Refill vent and re pressurise the system as necessary Refer to Commissioning section 5 1 7 If the boiler is in a cupboard or compartment ensure that the ventilation openings are ade...

Страница 21: ...HE BOILER 1 Replace the burner ensuring it is located correctly onto the side panels and that the leads to the flame sensing and ignition electrodes are connected Connect the main burner s union nut a...

Страница 22: ...lightly and remove Remove the two fixing screws one each side securing the control panel and hinge it forward 1 Heating circuit refer to Fig 13 Close the central heating flow and return valves and dra...

Страница 23: ...e to terminal 1 and brown to terminal 2 Ensure the pressure tubes are connected correctly red tube to clear tube to marked on the fan outlet as shown in Fig 23 and that the bottom of the combustion ch...

Страница 24: ...indow frame and remove the damaged glass and gasket 3 Re assemble in reverse order with a new glass and gasket Ensure the gasket is next to the inner case front panel 8 13 INTERNAL FUSE Refer to Fig 1...

Страница 25: ...Fig 28 1 Gain access as described in section 8 1 2 Withdraw the suppressor from the control panel cover 3 Disconnect the wiring and re assemble with a new suppressor Connect the wiring as follows Main...

Страница 26: ...nsure the pressure tubes are connected correctly refer to Fig 23 6 Refill and pressurise the system Refer to Commissioning section 5 1 8 24 PRESSURE GAUGE 1 Gain access as described in section 8 1 2 D...

Страница 27: ...w seals supplied 7 Refill and pressurise the system Refer to Commissioning section 5 1 8 29 HEATING RETURN FILTER Refer to Fig 13 1 Drain the boiler heating circuit as described in section 8 2 2 Unscr...

Страница 28: ...ckplate Pull the cylinder forward and out of the boiler 10 Re assemble in reverse order using the new seals supplied 11 Refill and pressurise the heating and hot water circuits Refer to Commissioning...

Страница 29: ...agrams NOTES 1 REMOVE LINK FROM TERMINALS 1 2 TO CONNECT EXTERNAL CONTROL 240V SWITCHING 2 A FROST THERMOSTAT IS INCORPORATED WITHIN MAIN PCB 3 LINK BETWEEN TERMINALS 55 56 MUST BE CONNECTED Br Brown...

Страница 30: ...0 9 2 FUNCTIONAL FLOW WIRING DIAGRAM Alpha 500E Wiring Diagrams NOTES 1 DENOTES MAIN TERMINAL BLOCK 2 A FROST THERMOSTAT IS INCORPORATED WITHIN MAIN PCB 3 LINK BETWEEN TERMINALS 55 56 MUST BE CONNECTE...

Страница 31: ...alling for heat Has DHW demand been satisfied 240 V across main terminal block terminals 1 and N YES Replace relay PCB Relay energised and contacts closed i e continuity between terminals 14 15 on PCB...

Страница 32: ...illuminated Air pressure switch proved neon stays off neon illuminated YES NO Go to section page 33 E Burner output modulates after approx 3 mins from max until storage temp set by DHW stat is reache...

Страница 33: ...CB Main PCB M7 connector is 240 V across terminals 4 5 Fan jammed or faulty winding i e cold resistance 45 ohm YES Replace fan Press red reset button 240V at gas valve and across ignition PCB M2 conne...

Страница 34: ...ng electrode and lead connections 2 Electrode position Flame current should be Maximum burner pressure 3 5 mA approx Minimum burner pressure 1 5 mA approx I Replace ignition PCB Replace flame sensing...

Страница 35: ...Grundfos UPS 15 60 AO and seals Pump head replacement UPS 15 60 and seals Fan assembly SEL type RL108 4200 A55 Air pressure switch Honeywell C6065F1100 Differential water flow switch and seals Diverte...

Страница 36: ...STORY Manual compiled and designed by Publications 2000 Tel 01670 356211 Alpha Therm Limited Goldsel Road Swanley Kent BR8 8EX Tel 01322 669443 Fax 01322 615017 Part No 920 308 1 These instructions ha...

Отзывы: