PAGE
26
ALMAC s.r.l.
2.8
Safety checks on the operation of the machine, to be performed before
use
The instructions given below must be followed.
•
Position the machine with the frame inclined to the horizontal with a value
greater than 0.5° on the side. Activate the automatic levelling control
(Automatic levelling), make sure that the system automatically keeps the
frame horizontal.
•
Position the machine with the frame inclined to the horizontal by a value
greater than 0.5° on the longitudinal. Activate the automatic levelling
control (Automatic levelling), make sure that the system automatically keeps
the frame horizontal.
•
Position the machine with the frame inclined to the horizontal at the
maximum angle both on the longitudinal and on the side. Activate the
automatic levelling control (Automatic levelling), make sure that the system
automatically keeps the frame horizontal.
•
Lift the loading platform (without load) to the maximum height and then
lower it a few times; make sure that the machine works correctly.
•
Operate the emergency button on the remote control; make sure that the
machine is switched off and that no function is permitted. Release the
mushroom-shaped button after this test.
•
Operate the emergency buttons on the ground (it is necessary to test the 3
buttons present); make sure that the machine is switched off and that no
function is permitted. Release the mushroom-shaped button after this test.
•
Operate the warning buzzer and make sure it works.
•
Check the operation of the buzzer when the drive function is activated.
•
Check with the machine in translation (with translation selector in DM) that
releasing the Joysticks the machine stops immediately.
Содержание MULTI-LOADER 2.5
Страница 41: ...PAGE 41 ALMAC s r l...
Страница 67: ...PAGE 67 ALMAC s r l A number of examples follow...
Страница 68: ...PAGE 68 ALMAC s r l...
Страница 69: ...PAGE 69 ALMAC s r l...
Страница 105: ...PAGE 105 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity FAC SIMILE...
Страница 107: ...PAGE 107 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Страница 117: ...PAGE 117 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...