
2
3
TerraStreamer
®
Early Streamer Emission (ESE) Terminals
Installation Guide
Table of Contents
Warranty ...............................................................................................
2
Supplied Items .....................................................................................
3
TerraSteamer
®
Early Streamer Emission (ESE) Terminals ..................
4
Features ..................................................................................................................................
4
Protection Performance ...................................................................................................
5
Protection Radius - Additional Levels ..........................................................................
5
Positioning & Height ............................................................................
6
TerraSteamer® ESE Terminal ............................................................................................
6
Preferred Installation Points ............................................................................................
6
Pre-Installation Checklist .................................................................................................
7
Important Safety and Other Considerations.............................................................
7
Ground System Configurations .....................................................................................
8
1. Installation of the Grounding System .............................................
8
Down Conductor Routing Guidelines .........................................................................
9
Number of Down Conductors and Grounds ..........................................................
10
Adaptor ................................................................................................................................
10
2. Down Conductor Installation ........................................................
11
3. Termination of the Down Conductor ............................................
12
Lower End ...........................................................................................................................
12
Upper End ...........................................................................................................................
13
4. TerraStreamer
®
ESE Terminal Installation ....................................
14
Guyed FRP Masts ..............................................................................................................
14
Metallic Masts....................................................................................................................
16
5. Lightning Strike Counter Installation ............................................
17
6. TerraStreamer
®
ESE Post Installation Verification
.......................
18
7. Inspection/Maintenance ...............................................................
18
Schedule .............................................................................................................................
18
Checklist ..............................................................................................................................
18
Disclaimer ..........................................................................................
19
Warranty
The warranty is limited to the cost of replacement of equipment providing it has
been installed and/or certified by Alltec or its authorized distributor. Alltec shall
in no event be responsible for any loss of business or profits, downtime or delay,
labor, repair or material costs or any similar or dissimilar consequential loss or
damage incurred by the buyer. All other costs such as: insurance premiums,
freight charges, loss of profit, and re-installation of equipment are not included.
Also specifically excluded from the warranty is any responsibility for other direct
or indirect damages, injuries or death.
NOTE: Alltec shall in no event be responsible if the products have
not been stored or used in accordance with its specifications and
recommended procedures.
Do not attempt to install lightning protection components or systems
during periods of lightning activity!