![ALLOMATIC SW-300DC Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/allomatic/sw-300dc/sw-300dc_installation-manual_2903752010.webp)
ARM LAYOUT & OPERATOR
PLACEMENT CONTINUED
Hinge point
Bracket
Bracket
Center shaft of
Operator
3
Measure distance from the
Y
Z.
point
And point
Say distance is 60”,
divide this number by 2,which =30”.
This is the length of primary arm in
next drawing.
PLEASE BE EXACT!!!
4
+
T
his ARM section is half the
distance between point
and point
as shown above.
Y
Z
IT MUST BE EXACT!!!
This pipe does not need to
be measured after primary
arm is installed this pipe
makes up the balance of
arm.
PRIMAR
Y ARM SECTION
CENTER OF
BOLT AT FIRST
HINGE POINT
CENTER OF
SHAFT ON
OPERATOR
X
X
Point
Y
Point
Z
+
9