
Allied Construction Products, LLC. www.alliedcp.com
10
TM103337_HP1600_18feb
7.0 Installation & Removal – [cont’d]
IMPORTANT
Collect fluids in a suitable container. Clean up spilled
fluids and obey all local regulations for the disposal
of these fluids.
IMPORTANT
The Ho-Pac will not operate if supply and return
hoses are crossed.
Fig. 7-1 Supply Hose with Tag & Valve Identified
1.
Connect Supply [IN] and Return [OUT] hoses to
carrier’s hydraulic circuit.
Fig. 7-2 Supply Hose, Valve & Motor Ports Identified
IMPORTANT
The control valve is attached to the top frame. The
part number of the valve can be found stamped into
the body above connection port T2.
2.
Raise the work tool off the ground and operate
the bucket cylinder to ensure hoses will not be
pinched or restricted.
3.
Briefly test for proper operation. Tighten hoses
and connections as necessary.
Fig. 7-3 Check hose length & routing for unrestricted
movement
7.3 Removal From Carrier
CAUTION
Fluid penetration hazard. Release
pressure trapped in hoses before
disconnecting. Wear appropriate
protective equipment including safety
eyewear and gloves.
CAUTION
Both operator and assistant must be
qualified in handling procedures. The
operator must have an unobstructed
view of the assistant and load at all
times. The operator shall maintain
full control of the machine at all
times.
Crush hazard. Keep clear of crush
points and moving parts. All
directions and signals must be
agreed upon in advance. Take
signals from only ONE person.