507271-02
Page 51 of 52
Issue 1621
Contractor’s: Name______________________________________Telephone________________Checklist Completed____________________
Job Address_______________________________________________________Technician’s Name___________________________________
1
HEATING MODE
COMBUSTION SAMPLE CO
2
%
______
CO _____ PPM
2
INDOOR BLOWER AMPS ______
3
TEMPERATURE RISE
4
Supply Duct Temperature
Return Duct Temperature
_
______
Temperature Rise
TOTAL EXTERNAL STATIC
5
Supply External Static
Return External Static
Total External Static
CONDENSATE LINE
6
Leak Free
VENT PIPE
7
Leak Free
COOLING MODE
INDOOR BLOWER AMPS ______
3
TEMPERATURE DROP
Return Duct Temperature
Supply Duct Temperature
Temperature Drop
4
DRAIN LINE
8
Leak Free
THERMOSTAT
Adjusted and Programmed
Explained Operation to Owner
9
SUPPLY
AIR
Blower Motor Amps
Duct Static
Thermostat
Gas Manifold Pressure
1
2
3
4
5
6
7
8
9
Temperatures
RETURN AIR
Combustion CO
2
UNIT OPERATION
TOTAL EXTERNAL STATIC (dry coil)
Supply External Static
Return External Static
Total External Static
5
______
______
=
+
______
______
______
=
_
______
______
______
=
+
______
______
______
=
GAS MANIFOLD PRESSURE “W.C.” ______
Содержание 92G1DF-P
Страница 17: ...507271 02 Page 17 of 52 Issue 1621 A95DF 95G1DF and A93DF 92G1DF Table 7 ...
Страница 18: ...507271 02 Page 18 of 52 Issue 1621 A95DF 95G1DF and A93DF 92G1DF Table 8 ...
Страница 31: ...507271 02 Page 31 of 52 Issue 1621 Figure 49 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 36: ...507271 02 Page 36 of 52 Issue 1621 Figure 56 Typical Wiring Diagram For A93DF 92G1DF ...
Страница 37: ...507271 02 Page 37 of 52 Issue 1621 Typical Wiring Diagram Figure 57 For A95DF 95G1DF ...
Страница 50: ...507271 02 Page 50 of 52 Issue 1621 Start Up Performance Check List ...