507271-02
Page 30 of 52
Issue 1621
6. If unit will be started immediately upon completion of
installation, prime trap per procedure outlined in Unit
Start-Up section.
Condensate line must slope downward away from the trap
to drain. If drain level is above condensate trap, condensate
pump must be used. Condensate drain line should be routed
within the conditioned space to avoid freezing of condensate
and blockage of drain line. If this is not possible, a heat
cable kit may be used on the condensate trap and line.
Heating cable kit is available in various lengths; 6 ft. (1.8
m) - kit no. 26K68; 24 ft. (7.3 m) - kit no. 26K69; and 50 ft.
(15.2 m) - kit no. 26K70.
Do Not
use copper tubing or existing copper condensate
lines for drain line.
CAUTION
Figure 46
Evaporator Coil Using a Separate Drain
Figure 45
Condensate Trap Location
(shown with right side exit of condensation)
Figure 47
Evaporator Coil Using a Common Drain
Figure 48
Condensate Trap with Optional Overflow Switch
When combining the furnace and evaporator coil
drains together, the A/C condensate drain outlet must
be vented to relieve pressure in order for the furnace
pressure switch to operate properly.
CAUTION
Содержание 92G1DF-P
Страница 17: ...507271 02 Page 17 of 52 Issue 1621 A95DF 95G1DF and A93DF 92G1DF Table 7 ...
Страница 18: ...507271 02 Page 18 of 52 Issue 1621 A95DF 95G1DF and A93DF 92G1DF Table 8 ...
Страница 31: ...507271 02 Page 31 of 52 Issue 1621 Figure 49 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 36: ...507271 02 Page 36 of 52 Issue 1621 Figure 56 Typical Wiring Diagram For A93DF 92G1DF ...
Страница 37: ...507271 02 Page 37 of 52 Issue 1621 Typical Wiring Diagram Figure 57 For A95DF 95G1DF ...
Страница 50: ...507271 02 Page 50 of 52 Issue 1621 Start Up Performance Check List ...