
Allied Construction Products, LLC Technical Manual Ho-Pac 300, 300B & 500, 500B
21
Fig. 7-1
Configured with “XSF” Top Frame
Typical Mounting Components Include: 1- Bolt,
2- Nut, 3- Flange Bushing, 4-Spacer,
5-mounting Pin (See Table 6.2)
IMPORTANT
The motor is assembled for clockwise
rotation. Pressurizing the outlet port will
damage the motor’s internal components.
Verify correct installation before
pressurizing the hydraulic circuit.
4. Connect Pressure and Return hoses.
Fig. 7-2
Hose Connections
1-Pressure ID Tag, 2-Control Valve, 3-Supply
Line (P1), 4-Return Line (T2)
5. Raise the Ho-Pac off the ground. Tilt the
compactor with the bucket cylinder to
assure the hoses will not be pinched or
restricted.
6. Briefly test Ho-Pac for proper operation.
Stop and check for hydraulic leaks.
Tighten hoses and connections as
necessary.
7.4 Removal from the Carrier
CAUTION
Crush hazard. Instruct operator to
move controls only when directed
by the Ho-Pac installer. Keep
hands and fingers clear of moving
parts and pinch points while
equipment is being positioned.
CAUTION
Burn hazard. Hydraulic
components, including the
hoses, motor and valve are hot
during operation. Avoid contact.
CAUTION
To avoid the risk of injury, wear
personal protective equipment,
including appropriate clothing,
gloves, safety eyewear and shoes
when handling the Ho-Pac.
CAUTION
Fluid penetration hazard.
Release pressure trapped in
hoses before disconnecting.
Wear appropriate protective
equipment including safety
eyewear and gloves.
1. Position attachment on stable ground.
2. Disconnect hydraulic connections.
3. Ensure all loads are adequately
supported before removing mounting
pins and hardware.
4. Remove attachment from carrier.
NOTE:
Reinstall mounting pins and
hardware on attachment to avoid loss or
damage.
Содержание 300
Страница 2: ......
Страница 64: ...Allied Construction Products LLC Technical Manual Ho Pac 300 300B 500 500B 53 NOTES ...
Страница 65: ......
Страница 66: ......