6. Lower the locking handle of the power supply module to secure the
module in the slot, as shown in Figure 51.
Figure 51. Locking the Handle on the AT-SBxPWRPOE1 Power Supply
Note
If the module does not fully seat in the chassis slot, check to be sure
you are installing a PoE power supply and not a system power
supply. The model name of the module is included on a label on the
locking handle. For more information, refer to “Power Supplies and
Power Supply Slots” on page 26.
7. To install a second AT-SBxPWRPOE1 Power Supply, repeat this
procedure.
8. After installing the AT-SBxPWRPOE1 Power Supplies, go to Chapter
7, “Installing the AT-SBx81CFC960 Control Card and Ethernet Line
Cards” on page 125.
Note
Retain the tie wrap that comes with the power supply. You use it to
secure the power cord to the chassis when you power on the unit in
“Powering On AT-SBxPWRPOE1 Power Supplies” on page 177.
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...