Chapter 12: Installing a Media Converter Module
108
Section II: Installation
2. Unpack the media converter module from its shipping container and
verify the package contents, listed in Table 26. If any item is missing or
damaged, contact your Allied Telesis sales representative for
assistance.
Note
You should retain the packaging material in the event you need to
return the unit to Allied Telesis.
3. Remove the insulator labelled “REMOVE BEFORE INSTALL” from the
battery on the media converter module by sliding it out from beneath
the battery clip.
Figure 51. Removing the Battery Insulator
Table 26. AT-MCF2000 Media Converter Module Items
Component
Description
One AT-MCF2012LC,
AT-MCF2012LC/1 or
AT-MCF2032SP Module
One Installation and User
Documentation CD or one
Media Converter Module
Installation Guide
1390
1405
Fast Ethernet
Media Converter
AT-MCF2012LC
Installation
Guide
Modules
AT-MCF2012LC/1
or
1169b
Battery Insulator
Содержание AT-MCF2000
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 18: ...Preface 18...
Страница 20: ...20 Section I Features...
Страница 26: ...Chapter 1 AT MCF2000 Multi channel Media Converter Series 26 Section I Features...
Страница 54: ...Chapter 3 AT MCF2012LC AT MCF2012LC 1 and AT MCF2032SP Modules 54 Section I Features...
Страница 72: ...Chapter 4 AT MCF2000M Management Module 72 Section I Features...
Страница 84: ...Chapter 5 AT MCF2000S Stacking Module 84 Section I Features...
Страница 86: ...86 Section II Installation...
Страница 90: ...Chapter 6 Reviewing the Safety Precautions 90 Section II Installation...
Страница 92: ...Chapter 7 Selecting a Location 92 Section II Installation...
Страница 96: ...Chapter 8 Unpacking the AT MCF2000 or AT MCF2300 Chassis 96 Section II Installation...
Страница 98: ...Chapter 9 Removing the Rubber Feet 98 Section II Installation...
Страница 106: ...Chapter 11 Installing the AT MCF2KFAN Module 106 Section II Installation...
Страница 110: ...Chapter 12 Installing a Media Converter Module 110 Section II Installation...
Страница 122: ...Chapter 15 Installing the Chassis in an Equipment Rack 122 Section II Installation...
Страница 128: ...Chapter 17 Installing the SFP Modules in the AT MCF2032SP Module 128 Section II Installation...
Страница 130: ...Chapter 18 Cabling the Ports on the Media Converter Module 130 Section II Installation...
Страница 134: ...Chapter 19 Cabling the AT MCF2000M and AT MCF2000S Modules 134 Section II Installation...
Страница 138: ...Chapter 20 Powering on the Chassis 138 Section II Installation...
Страница 156: ...Chapter 23 Troubleshooting the Modules 156 Section II Installation...
Страница 186: ...Appendix C Cleaning Fiber Optic Connectors 186...
Страница 190: ...Index 190...