Chapter 2: Installing the Bridging Converter
50
Powering On the Bridging Converter
Once the converter is ready to be used, perform the following procedure
to power it on:
To power on an AT-GS2002 AC powered chassis, perform the following
procedure:
Note
The power adapter is not used if you install the AT-GS2002 in an
AT-MCR12 chassis.
1. Locate the power terminal block on the rear panel of the AT-GS2002
AC powered chassis.
2. Plug one end of the power cord to the power receptacle connector
labeled 12VDC, as shown in Figure 21.
Figure 21. Connecting Power Cord to an AT-GS2002 AC Powered
Chassis
12VDC
10
100
SPEED
(Mbps)
OFF
ON
AUTO
NEG
HALF
FULL
DUPLEX
MODE
2 2 2
PORT
355
Содержание AT-GS2002 Series
Страница 1: ...AT GS2002 AT GS2002 SP Gigabit Bridging Converters Installation Guide PN 613 50648 00 Rev A...
Страница 8: ......
Страница 32: ......
Страница 58: ......
Страница 64: ......
Страница 91: ...AT GS2002 Series Installation Guide 91 1 1 2 3 LAN 4 5 6 I 7 8 9 40 C...
Страница 92: ...Appendix C Translated Electrical Safety and Emission Information 92 10 11 15 LAN OFF 12 13 14 15 16 17 18 19...
Страница 93: ...AT GS2002 Series Installation Guide 93 20 21 22 23 24 25 26 UL 600 90 C 14 AWG 27 28 29...
Страница 95: ...AT GS2002 Series Installation Guide 95 41 42 TEL PSTN 43 26 AWG...
Страница 96: ......