AT-FS708LE/POE Fast Ethernet Switch Installation and User’s Guide
25
Powering On the Switch
The AT-FS708LE/PoE is operating with DC power input. Use the AC
power adapter that came with the switch to supply AC power.
To power on the switch, perform the following procedure:
1. Attach the power cord to the power connector on the back of the switch
as shown in Figure 4.
Figure 4. Attach the Power Cord into the Connector
2. Plug the other end of the power cord into a wall outlet. See Figure 5.
Figure 5. Plug the Power Cord into a Wall Outlet
3. Verify the PWR LED is green. If the LED id off, see Chapter 3,
The switch is now powered on and ready for network operations.
Note
Allied Telesis recommends attaching the power cord to the switch
before plugging the power cord into a wall outlet.