Chapter 3: Beginning the Installation
62
Hardware Installation Overview
Table 11 lists the general steps to installing the switch hardware.
Table 11. Hardware Installation Procedures
Step
Description
Procedure
1
Review safety precautions.
“Reviewing Safety
Precautions” on page 64
2
Choose locations for the
switches.
“Choosing a Site for the
Chassis” on page 69
3
Unpack the hardware.
“Unpacking the Chassis”
on page 70
“Unpacking AT-
SBxPWRSYS2 AC Power
Supplies” on page 75
“Unpacking AT-
SBxPWRSYS1-80 DC
Power Supplies” on
page 76
4
Install the hardware.
“Adjusting the Equipment
Rack Brackets” on page 79
“Installing the Chassis in an
Equipment Rack” on
page 83
“Installing the Chassis
Grounding Wire” on
page 84
“Installing AT-
SBxPWRSYS2 AC Power
Supplies” on page 87
“Installing AT-
SBxPWRSYS1-80 DC
Power Supplies” on
page 91
Содержание AT-FAN08
Страница 10: ...Figures 10...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 38: ...Chapter 1 Overview 38...
Страница 60: ...Chapter 2 Virtual Chassis Stacking 60...
Страница 80: ...Chapter 4 Installing the Chassis 80 Figure 32 Chassis Orientations in the Equipment Rack Continued...
Страница 82: ...Chapter 4 Installing the Chassis 82 Figure 34 Example of Adjusting the Equipment Rack Brackets...
Страница 104: ...Chapter 4 Installing the Chassis 104...
Страница 140: ...Chapter 5 Powering On the Chassis 140...
Страница 166: ...Chapter 7 Cabling the AT XEM2 Line Card Ports 166...
Страница 214: ...Appendix A Technical Specifications 214...