Chapter 3: Beginning the Installation
70
Unpacking the Chassis
Figure 23 shows the contents of the shipping box.
Figure 23. AT-SBx908 Gen2 Switch Shipping Box
The items in the box are listed here:
A - Protective bag
B - AT-SBx908 Gen2 Switch
C - Accessory kit
To unpack the switch, perform the following procedure:
1. Lift the switch from the shipping box and place it on a level, secure
table. Refer to Figure 24 on page 71.
A
B
C
Содержание AT-FAN08
Страница 10: ...Figures 10...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 38: ...Chapter 1 Overview 38...
Страница 60: ...Chapter 2 Virtual Chassis Stacking 60...
Страница 80: ...Chapter 4 Installing the Chassis 80 Figure 32 Chassis Orientations in the Equipment Rack Continued...
Страница 82: ...Chapter 4 Installing the Chassis 82 Figure 34 Example of Adjusting the Equipment Rack Brackets...
Страница 104: ...Chapter 4 Installing the Chassis 104...
Страница 140: ...Chapter 5 Powering On the Chassis 140...
Страница 166: ...Chapter 7 Cabling the AT XEM2 Line Card Ports 166...
Страница 214: ...Appendix A Technical Specifications 214...