![Allied Telesis AT-9924SP Скачать руководство пользователя страница 57](http://html1.mh-extra.com/html/allied-telesis/at-9924sp/at-9924sp_hardware-reference-manual_2902126057.webp)
56
x900 Series Switch and SwitchBlade
®
x908
C613-03092-00 REV J
INFO: Initial download
succeeded
Startup tests and download are complete, and the switch
software is about to be started.The release is now
decompressed. This may take a few seconds.
INFO: Downloading
compressed release. This may
take up to 1 minute...
INFO: Loading software into
memory. This may take up to 1
minute...
The main switch software is decompressed before being
loaded into RAM.
INFO: Executing configuration
script <script-name>
Configuration commands in the given script file begin
executing if selected by the user. If the script has an error,
appropriate error messages are displayed.
INFO: Switch startup complete
The startup process is complete and the switch is ready. If
devices connected to it are sending traffic, then the switch
begins switching operations.
Message
Description
(cont)