![Allied Telesis AT-9000/24 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/allied-telesis/at-9000-24/at-9000-24_installation-manual_2902754021.webp)
AT-9000/24 Gigabit Ethernet Switch Installation Guide
21
Table 4 describes the LEDs for the SFP ports.
Table 4. SFP Port LEDs
LED
State
Description
LINK/ACT Off
The port has not established a link with an
end node.
Blinking
Green
The port is transmitting or receiving data.
Green
A valid link has been established on the port.
Содержание AT-9000/24
Страница 1: ...613 000239 Rev A Layer 2 Gigabit Ethernet Switch AT 9000 24 Installation Guide...
Страница 6: ...Contents 6 Appendix B Translated Safety Statements 53...
Страница 8: ...Figures 8...
Страница 10: ...Tables 10...
Страница 28: ...Chapter 1 Overview 28...
Страница 46: ...Chapter 2 Installation 46...
Страница 48: ...Chapter 3 Troubleshooting 48...
Страница 52: ...Appendix A Technical Specifications 52...
Страница 74: ...Appendix B Translated Safety Statements 74 1 1 2 3 LAN 4 5 6 I 7 8 9 40 C 10 11 15 LAN OFF 12...
Страница 77: ...AT GA950 16 and AT GA950 24 Gigabit Ethernet Smart Switches Installation Guide 77 41 42 TEL PSTN 43 26 AWG...
Страница 78: ...Appendix B Translated Safety Statements 78...