
Chapter 6: Cabling the Networking Ports and Powering On the Switch
78
4. Connect the power cord to an appropriate AC power source. Refer to
Figure 38. Connecting the Power Cord to an AC Power Source
Note
The illustration shows a North American power cord. Your power
cord may be different.
5. Wait two minutes for the switch to initialize the management software.
The installation is complete. The switch is now ready for network
operations. To start managing the switch, refer to “Starting a Local
Management Session” on page 79.
Содержание AlliedWare Plus AT-GS980M/52
Страница 8: ...Figures 8...
Страница 10: ...Tables 10...
Страница 14: ...Preface 14...
Страница 46: ...Chapter 2 Beginning the Installation 46...
Страница 50: ...Chapter 3 Installing the Switch on a Table or Desktop 50...
Страница 53: ...GS980M Series Installation Guide 53 Figure 19 GS980M Switch Orientations in an Equipment Rack...
Страница 82: ...Chapter 6 Cabling the Networking Ports and Powering On the Switch 82...
Страница 86: ...Chapter 7 Troubleshooting 86...