
Chapter 5: Installing the Switch on a Wall
60
wall studs and hot electrical wiring (not provided)
Drill and 1/4” carbide drill bit for a concrete wall (not provided)
Plywood base (not provided) for installing the switch on a wall with
wooden studs. Refer to “Plywood Base” on page 61.
Four screws for attaching the plywood base (not provided)
Caution
The supplied screws and anchors might not be suitable for all walls.
A qualified building contractor should determine the hardware
requirements of your wall prior to installing the switch.
E88
Содержание AlliedWare Plus AT-GS980M/52
Страница 8: ...Figures 8...
Страница 10: ...Tables 10...
Страница 14: ...Preface 14...
Страница 46: ...Chapter 2 Beginning the Installation 46...
Страница 50: ...Chapter 3 Installing the Switch on a Table or Desktop 50...
Страница 53: ...GS980M Series Installation Guide 53 Figure 19 GS980M Switch Orientations in an Equipment Rack...
Страница 82: ...Chapter 6 Cabling the Networking Ports and Powering On the Switch 82...
Страница 86: ...Chapter 7 Troubleshooting 86...