![Allied Systems Freeman 370 Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/allied-systems/freeman-370/freeman-370_operators-and-parts-addendum_2901913048.webp)
Knotter Drive Installation, Gearbox Baler
Page 1 of 2
Knotter Drive Installation; Gearbox Baler
Page 1 of 2
DETAIL E
A
A
B
B C
C
D
D
E
SECTION A-A
1
11
22
4
4
7
9
26
6
15 24
27
23
8
16
24
23
1.2
1.3
1.2.4
SECTION C-C
20
25
10
21 10
21
3
1.1
1.1
5
28
21
30
28 21 30
SECTION D-D
19
7
9
12
23
17
13
18
3
21
6
21
4
28 21 30
28 21
30
SECTION B-B
14
2
29
4
3
1-5
NOTES:
1.1 - IDLER SPROCKET ALIGNED TO FOLLOW PATH OF CHAIN. CHAIN SHOULD NOT RUB KNOTTER SHAFT SPROCKET WHEN OPERATING. USE AS
REQUIRED BUT SUGGESTED QUANTITY IS SHOWN.
1.2 - CHAIN ASSEMBLY NOTES:
1.2.1 - TAILLESS KNOTTER: USE (2) OFFSET DRIVE LINKS (F000000759) AND (1) CONNECTING LINK (F000000760) FROM F000007055.
1.2.2 - CONVENTIONAL KNOTTER: USE (1) CONNECTING LINK (F000000760) FROM F000007055.
1.2.3 - INSTALL CLIP FOR CONNECTING LINK FURTHEST FROM THE FRAME.
1.2.4 - ROUTE THIS SIDE OF THE CHAIN TO THE INSIDE IDLER SPROCKET.
1.3 - (2) OF ITEM 23 IS NEEDED TO PREVENT BOLT FROM PUSHING ON THE CHAMBER LINER.
1.4 - PHOTO SHEET IS AVAILABLE FOR REFERENCE IN THE VIEWER.
CHAIN BRACKET (906818) IS CALLED OUT AND PRE-MOUNTED DURING CHAMBER INSTALLATION.
48
89-096
Rev: 11-2016
Содержание Freeman 370
Страница 8: ...Intentionally Left Blank 8 89 096 Rev 11 2016...
Страница 13: ...Intentionally Left Blank 13 89 096 Rev 11 2016...
Страница 25: ...Intentionally Left Blank 25 89 096 Rev 11 2016...
Страница 107: ...Intentionally Left Blank 107 89 096 Rev 11 2016...