
Produce and Consume Tags (interlock controllers)
Chapter 5
7.
From the Tag Properties dialog box, complete these fields:
•
•
From the Type pull-down menu, choose Consumed.
In the Data Type field, type a data type that the controller can produce.
A controller cannot produce a tag by using the MSG or INT data types.
8.
Click Connection.
9.
From the Consumed Tag Connection dialog box, complete these fields:
•
From the Producer pull-down menu, choose Producing_controller.
This menu contains all possible paths to previously configured
•
controllers in the I/O tree.
In the Remote Data field, type the name of the produced tag in the
•
producing controller.
In the RPI field, enter the rate at which the tag will be produced.
10.
Click OK.
11.
Use RSNetWorx for ControlNet software to schedule the network.
Rockwell Automation Publication CNET-
UM001E-EN-P - June 2016
81
Содержание ControlNet Compact GuardLogix 1769
Страница 4: ...SummaryofChanges Notes 4 Rockwell Automation Publication CNET UM001E EN P June 2016...
Страница 8: ...Preface Notes 8 Rockwell Automation Publication CNET UM001E EN P June 2016...
Страница 70: ...Chapter 4 ControlI O Notes 70 Rockwell Automation Publication CNET UM001E EN P June 2016...
Страница 99: ......