background image

2

IMPORTANT SAFETY INSTRUCTIONS (CONTINUED)

BEFORE GATE OPERATOR INSTALLATION

Ÿ

Confirm that the gate operator being installed is 
appropriate for the application.

Ÿ

Confirm  that  the  gate  is  designed  and  built 
according  to  the  current  published  industry 
standards.

Ÿ

Confirm that all appropriate safety features and 
safety  accessory  devices  are  being  installed, 
including all entrapment protection devices.

Ÿ

Make sure that the gate opens and closes freely 
(by hand) before installing the operator.

Ÿ

Repair  or  replace  worn  or  damaged  gate 
hardware before installing the gate operator.

Ÿ

Eliminate all gaps in the sliding gate below a 6 
foot height that permits a 2 1/4” sphere to pass 
through any location. This includes the area of 
the adjacent fence covered when the gate is in 
the open position

Ÿ

Eliminate all gaps in a swing gate below a 4 foot 
height that permits a 4” sphere to pass through 
any location. This includes the hinge area of the 
gate.

GATE OPERATOR INSTALLATION

Ÿ

Operator must be disconnected from the power 
source  before  attempting  any  installation  of 
accessories.

Ÿ

Install gate operator according to the installation 
instructions in this manual.

Ÿ

Adjust the operator clutch or load sensing device 
to the minimum force setting that will allow for 
reliable gate operation.

Ÿ

Install the operator inside the fence line. Do not 
install the operator on the public side of the fence 
line.

Ÿ

Install  a  proper  electrical  ground  to  the  gate 
operator.

Ÿ

Controls  intended  for  user  activation  must  be 
located at least 6 feet away from any moving part 
of  the  gate,  and  where  the  user  is  prevented 
from  reaching  over,  under,  around,  or  through 
the gate to operate the controls.  

Ÿ

Outdoor or easily accessible controls shall have 
a security feature to prevent unauthorized use.

Ÿ

The stop and/or reset button must be located in 
the  line  of  sight  of  the  gate.  Activation  of  the 
operator  reset  control  shall  not  cause  the 
operator to move.

Ÿ

Install  a  minimum  of  2  warning  signs,  one  on 
each  side  of  the  gate  where  they  are  easily 
visible.  

Ÿ

Take pictures of the installation.

Ÿ

Test all safety features for proper function before 
placing  the  automatic  vehicular  gate  in 
operation.

MAINTENANCE

Ÿ

Train owners/users on the basic functions and 
safety  features  of  the  gate  system,  including 
how  to  turn  off  the  power  and  operate  the 
manual disconnect feature.

Ÿ

Leave  safety  instructions,  product  literature, 
installation  manual,  and  maintenance  manual 
with the owner or end user.

Ÿ

Explain to the owner or end user the importance 
of  routine  service  and  operator  testing  on  a 
monthly basis.

INSTALL THE GATE OPERATOR ONLY WHEN YOU 

HAVE READ THE FOLLOWING

Содержание SL-175DC

Страница 1: ...SL 175DC...

Страница 2: ......

Страница 3: ...ersing Device ERD Adjustment 14 Timer Adjustment and Radio Setting 15 Dip Switch Functions 16 LED Diagnostics 17 WIRING ACCESSORIES TO CONTROL BOARD Accessory Connections 18 Monitored Entrapment Prote...

Страница 4: ...the gate is not moving It is advised that the power be turned off Always keep people and objects away from the gate No one should cross the path of a moving gate The gate operator must be tested month...

Страница 5: ...minimum force setting that will allow for reliable gate operation Install the operator inside the fence line Do not install the operator on the public side of the fence line Install a proper electric...

Страница 6: ...cted access locations not servicing the general public and where unauthorized access is prevented via supervision by security personnel THE SIX TYPES OF OBSTRUCTION SENSING SYSTEMS TYPE A Inherent ent...

Страница 7: ...4 6 11 16 6 11 16 SIX RED HEAD BOLTS 1 2 X 3 1 2 17 25 20 20 30 14 27 3 4 10 SL 175 DC CONCRETE PAD...

Страница 8: ...5 FRONT MOUNT INSTALLATION DRIVEWAY GATE CLOSED GATE OPERATOR TRACK FOOTING OPERATOR FOOTING FRONT VIEW OVERHEAD VIEW TRACK FOOTING OPERATOR FOOTING GATE IN OPEN POSITION...

Страница 9: ...6 27 3 4 14 TOTAL COVER HEIGHT DRIVE CHAIN LEVEL TOP OF OPERATOR PAD FRONT MOUNT INSTALLATION CONTINUED...

Страница 10: ...E OPERATOR OPERATOR FOOTING OPERATOR FOOTING TRACK FOOTING TRACK FOOTING FRONT VIEW OVERHEAD VIEW GATE OPERATOR FOOTING MOVE ONE IDLER TO THE BOTTOM CENTER HOLE AND FOLLOW THE CHAIN PATH AS SHOWN CHAI...

Страница 11: ...non contact photoelectric sensor or contact edge for each entrapment zone prior to gate operation The operator cycles power to the external entrapment protection device and checks for device signals I...

Страница 12: ...Below is a typical loop layout When connecting to an All O Matic circuit board use the following Safety Loop Normally Closed N C Contacts Exit Loop Normally Open N O Contacts Wires MUST be twisted fr...

Страница 13: ...ith a single length wire NEVER use two wires for the ground Check the local city code for proper earth ground rod type and grounding procedures OPERATORS MUST BE PROPERLY GROUNDED 230V 115V GRD LINE 1...

Страница 14: ...tor 2 Push the limit lock plate down on the SL 45 DC SL 90 DC and SL 100 DC or outwards on the SL 150 DC 3 Turn the limit nut in the desired direction Toward the switch to decrease travel and away fro...

Страница 15: ...2262 2262 2262 2262 2262 2262 2402 2402 2402 2402 2402 2402 2402 20M 90R9 10R0 1000 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 476E 900R3 476E 900R3 5W 01 I06...

Страница 16: ...1 1001 1001 1001 1001 1001 1001 1001 1001 1001 1001 1001 1001 1001 1001 1001 1001 1001 1001 00 00 1001 1001 1001 1001 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 2262 22...

Страница 17: ...1 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 2262 2262 2262 2262 2262 2262 2402 2402 2402 2402 2402 2402 2402 20M 90R9 10R0 1000 1501 1501 1501 1501 1501 1501 1501 1501...

Страница 18: ...1 1001 1001 1001 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 2262 2262 2262 2262 2262 2262 2402 2402 2402 2402 2402 2402 2402 20M 90R9 10R0 1000 1501 1501 1501 1501 1501...

Страница 19: ...between the limit nut and limit switch This function should only be used on uphill or downhill applications A 20 amp dedicated circuit breaker should be used when this switch is on OPEN L R OPEN L R s...

Страница 20: ...evice is not installed MON_CLOSE ON when the MON_CLOSE input is activated open circuit to common or when a device is not installed TIMER Blinks when the timer is counting down to close automatically C...

Страница 21: ...C8RB LMC64 82AIM 1002 1002 1002 2402 2402 2402 2402 2402 2402 2402 20M 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 MAAF S21B 100 HFK 7J2 DR127 330 43CL07 E 710 KE 710 KE The circuit board has a...

Страница 22: ...When the gate is opening it will reverse for 2 seconds and stop if it senses an obstruction This input does nothing in the closing direction Upon power up if a device is not detected the operator will...

Страница 23: ...N O 1 MON_CLOSE OR MON_OPEN COM COMMON 24 TO 240 VAC COMMON 24 TO 240 VAC MON_12VDC EMX IRB RET IRB MON SWITCH CONTACT CONTACT SW1 OFF N C MON_CLOSE OR MON_OPEN SW2 OFF COM COMMON SW3 OFF POWER VRX C...

Страница 24: ...al of the board IMPORTANT Use different frequencies for each loop detector to eliminate interference Outside Safety loop Inside Safety loop Exit loop WHEN USED Exit Loop Phantom Loop Safety Loop See s...

Страница 25: ...62 2402 2402 2402 2402 2402 2402 2402 20M 90R9 10R0 1000 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 476E 900R3 476E 900R3 5W 01 I0615 I O 710 710 710 710 710...

Страница 26: ...reset the power 3 Connect the master slave communication wires to DATA and DATA The M S LINK LED should be ON on both machines 4 Connect all accessories to the master operator Accessories installed on...

Страница 27: ...low MAGNETIC LOCK SOLENOID LOCK STEP DOWN TRANSFORMER 1001 00 00 1001 1002 1002 1002 1002 1002 1002 1002 1002 1002 1002 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 710 710 710 710 710...

Страница 28: ...1 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 476E 900R3 476E 900R3 5W 01 I0615 I O 710 710 710 710 710 710 710 710 710 710 SS 14 SS 14 829B R616 90R9 10R0 1000 SS 14 829B R616 90R9 10...

Страница 29: ...ERGENCY RELEASE OFF SAFETY EXIT 115VAC LIMIT SWITCHES Procedures to manually open Gate 1 Turn operator power OFF 2 Push foot pedal down and move to the left to lock pedal in down position 3 Push gate...

Страница 30: ...9 10R0 1000 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 476E 900R3 476E 900R3 5W 01 I0615 I O 710 710 710 710 710 710 710 710 710 710 SS 14 SS 14 829B R616 90R...

Страница 31: ...2 1002 2262 2262 2262 2262 2262 2262 2402 2402 2402 2402 2402 2402 2402 20M 90R9 10R0 1000 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 1501 476E 900R3 476E 900R3 5W...

Страница 32: ...Lock tabs are provided in the hardware bag for the SL 45 DC only Remove bolt and install lock tabs for cover to secure with a pad lock Lock kits available for purchase for SL 90 DC SL 100 DC SL 100FP...

Страница 33: ...30...

Отзывы: