ASDI Operations and Maintenance – TX Models – P/N: 52368
5-26
Liqui–SAFE
TM
Valve
–
Service
Instructions
There are four (4) o-rings in the Liqui-SAFE
TM
valve; the Button Post o-ring,
Valve Body o-ring, Valve Seat o-ring and Valve Stem Base o-ring. Follow the
instructions below to service the Liqui-SAFE
TM
valve. Clean all the metal parts
with WD-40. Re-assemble all the parts. Simulate the tripping action of the valve
to ensure proper latch operation before re-installing in the vaporizer. The tripping
force applied on the Extension Stem is between 0.2 lbf (0.89 N) and 0.5 lbf (2.22
N).
Figure 11A – STEP 1 – Be sure that the Liqui-SAFE
TM
valve is in the close position as shown
Figure 11B – STEP 2 – Unscrew reset button base and remove the spring
UNSCREW RESET
BUTTON BASE
REMOVE SPRING
Содержание TORREXX TX100
Страница 8: ......
Страница 56: ...APPENDIX A TECHNICAL INFORMATION ...
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 83: ...ASCO Valve used by Algas SDI ...
Страница 86: ...ASCO Valve used by Algas SDI ...
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......