
22
Eve Double Pro-line | Version 1.0 | June 2020
ENGLISHENGLISH
4 COMMISSIONING THE CHARGING STATION
4.1 Safety instructions prior to usage
Ensure the following safety instructions are complied with
prior to commissioning your charging station:
1.
Ensure the charging station is properly connected to
the power supply as described in this manual.
2.
Ensure that the distribution of the electricity supply
is separately protected by appropriate circuit breakers
or fuses.
3.
Ensure the charging station is installed in compliance
with this manual.
4.
Ensure that the casing always remains closed during
normal use.
5.
Ensure that the charging cable is not twisted and the
cable, plug and casing are undamaged.
4.2 Commissioning
Switch on the power at the power cable. The charging
station will now run a self-diagnostic. During this process,
the following actions are performed:
1.
The display briefly illuminates and then switches off.
2.
The sockets are tested individually:
-
testing locking
-
testing internal relays, switching is audible
3.
The display briefly illuminates.
4.
The display switches on and shows the notification
‘Charge point starting up’.
5.
The start screen appears on the display, showing the
logo.
6.
The Alfen Eve Double Pro-line is now ready for use. If
the charging
station is configured to connect with an
administration system, this will happen automatically
and directly.
7.
The charging station may be configured further if
desired. Use the Service Installer software application
to gain access.
8.
Did you have your charging station configured with
a smart charge feature? Then please verify its settings
with the Service Installer to optimally configure the
chargingstation for local requirements.
For more information, please refer to Appendix B.
4.3 Configuring the charging station with Service
Installer Application
4.3.1 Preparation
Eve Double Pro-line
charging stations are easily configured
using the Service Installer Application. This application
allows you to access many settings, view the factory
settings and see all the completed transactions and recog-
nised charge passes.
The version number of the Service Installer Application is
connected with that of the firmware to show you which
new functionalities are supported by your charging station.
Tip: Before installing the charging station, make sure you
have a user account and are using the newest version
of the Service Installer Application. You can request an
account at: http://support.alfen.com. Click on ‘Sign up for an
account’. Note that new account creation may take several
working days.
Connect the charging station to your laptop with an
Ethernet cable (UTP).
REMARK
The Service Installer Application is available for download
for Microsoft Windows on: www.alfen.com/en/downloads.
‘EV charging points’. If you do not yet have an account to
use the Service Installer Application, you can request one
through http://support.alfen.com ->
'Configuration Tool' -> 'Sign up for an account'.
Language Country
code
Language Country
code
Language Country
code
Language Country
code
Language Country
code
Dutch
nl_NL
German
de_DE
Spanish
es_ES
Italian
it_IT
Swedish
sv_SE
English
en_GB
French
fr_FR
Portugese
pt_PT
Norwegian
nn_NO
Finnish
fi_FI
Содержание Eve Double Pro-line
Страница 1: ...Manual Handboek Handbuch Manuel Eve Double Pro line...
Страница 2: ...OUTSIDE BUITENZIJDE AUSSENSEITE EXT RIEUR 1 3 5 6 7 5 2 4 6 5 8...
Страница 3: ...INSIDE BINNENZIJDE INNENSEITE INT RIEUR 9 13 10 9 11 12 14 15...
Страница 4: ...4...