Hardware Installation
4-8
4
2.
Pan the antenna horizontally back and forth while checking the RSSI voltage. If
using the pole-mounting bracket with the unit, you must rotate the mounting
bracket around the pole. Other external antenna brackets may require a
different horizontal adjustment.
3.
Find the point where the signal is strongest (highest voltage) and secure the
horizontal adjustment in that position.
Note:
Sometimes there may not be a central lobe peak in the voltage because vertical
alignment is too far off; only two similar peaks for the side lobes are detected. In
this case, fix the antenna so that it is halfway between the two peaks.
4.
Loosen the vertical adjustment on the mounting bracket and tilt the antenna
slowly up and down while checking the RSSI voltage.
5.
Find the point where the signal is strongest and secure the vertical adjustment
in that position.
6.
Remove the voltmeter cable and replace the RSSI connector cover.
Содержание AWAP05O
Страница 1: ...Dual Band Outdoor Access Point Bridge User Guide ...
Страница 2: ......
Страница 4: ...AWAP05O ZZ AWAP05OM ZZ F1 1 0 0 E072004 R01 150xxxxxxxxA ...
Страница 28: ...Network Configuration 2 6 2 ...
Страница 50: ...Initial Configuration 5 8 5 6 Click the OK button to restart the access point ...
Страница 200: ...Troubleshooting A 2 A 5 If you forgot or lost the password Contact Technical Support ...
Страница 212: ...Specifications B 12 B ...
Страница 220: ...Glossary Glossary 4 ...
Страница 224: ...Index 4 Index ...
Страница 225: ......
Страница 226: ...E032004 R01 150xxxxxxxxxA ...