5 Maintenance
Study the instructions carefully.
The items refer to the parts list and service kits section. Handle scrap correctly.
A/A = Air/air activated.
Service tool: see spare parts.
5.6
Actuator bushing replacement
If the actuator is marked with a danger warning, do NOT attempt to cut the actuator open.
DO NOT DISASSEMBLE
kg
!
SPRING UNDER LOAD
Do not attempt to cut open
kg
!
Do NOT attempt to disassemble the actuator due to spring
under load danger!
Do NOT attempt to cut the actuator open due to spring
under load danger!
Step 1
Introduction
-
The actuator service kit contains two bushings and four o-rings.
-
Mount the thick O-ring inside and the thin O-ring outside the
bushing.
-
Always lubricate the spindle and o-rings thoroughly with
“Molykote Longterm 2 Plus” before mounting the new bushings.
2200-0099
DO NOT DISASSEMBLE
kg
!
30