3 Installation
All position numbers and item numbers refer to the drawings show and specified in chapter 7 Parts list/Service kits.
Step 3
3.3.4
1. Having the shaft and propeller assembly positioned in the tank a second sling is attached to the lifting eye (51) and that
second sling is pulled through the top plate (100) (which has the welding flange for the Agitator (60) welded into it).
2. Using the second sling the shaft and propeller assembly can be positioned and secured at the top of the welding flange
(60) using the fastener tool (50) (see section 7.4 Accessories, Mounting tools). Remember to have the gasket (101)
positioned correctly.
3. Unscrew the lifting tool (51) from the shaft and propeller unit and store it.
4304-0011
12
Содержание ALT-SB-15
Страница 1: ...100000242 EN3 2020 05 Original manual Instruction Manual ALT SB 15...
Страница 2: ......