background image

 

Installing an OmniAccess

3

 

4. Install an Uplink Submodule

 

Skip this step if:

• you are not installing an uplink submodule, or 

• an uplink submodule was installed for you at 

the factory.

 

 

 Caution 

 

 

Do not attempt to install or remove an 
uplink module while the switch’s 
power is on. Verify that the switch is 
powered off before proceeding.

 

5. Connect to a Power Source

 

All OmniAccess switches are powered by an internal 

 

AC

 

 power supply. The 

 

AC

 

 power connector can be 

found on the rear panel of all OA-512 switches.

 

 

 Note 

 

 

OmniAccess switches do not support 
the Alcatel Backup Power System 
(BPS).

Connect the provided power cord to the 

 

AC

 

 power 

connector on the OmniAccess. Then plug the power 
cord into a properly grounded 

 

AC

 

 electrical outlet.

 

6. Turn the Power On

 

Move the 

 

ON

 

/

 

OFF

 

 power switch (located next to the 

 

AC

 

 power connector) to the 

 

ON

 

 (

 

|

 

) position.

a.

Use a screwdriver to remove the blank uplink sub-
module cover plate on the OA-512 front panel.

b.

Insert the uplink submodule into the uplink submodule 
slot. Uplink submodules have an “up” and a “down” 
side. Use the printing on the submodule’s front panel as 
a reference for orienting the submodule—if the printing 
is right-side up, you are installing the submodule cor-
rectly.

c.

Slide the uplink submodule in until it rests against the 
connector, then press firmly until it seats into the con-
nector. Once installed, tighten the screws by hand or 
with a flat blade screwdriver. Ensure that the screws are 
completely screwed down, but do not overtighten.

Содержание OA-512

Страница 1: ...OmniAccessTM 512 Getting Started Guide May 2002...

Страница 2: ...rack should begin at the bottom When multiple components are installed precautions should be taken to prevent overloading of power outlets The switches should always be properly grounded Lithium Batt...

Страница 3: ...EDs 4 Connect External Devices 4 Connect the Console Port 5 Access your Terminal Emulation Software 5 Log In to the Command Line Interface CLI 5 Setting Up Software 5 Set up a Password 7 Set the Syste...

Страница 4: ...ports a maximum of one ISDN module per switch chassis Refer to the OmniAccess 512 User Manual for more information This Getting Started Guide walks you through installa tion and startup procedures for...

Страница 5: ...d a secure flat surface for the switch preferably on a desk or in a wiring closet For proper cooling the sides of the switch should have at least two inches of clearance Be sure that the switch is wit...

Страница 6: ...the OmniAccess Then plug the power cord into a properly grounded AC electrical outlet 6 Turn the Power On Move the ON OFF power switch located next to the AC power connector to the ON position a Use...

Страница 7: ...k green PS LED will display solid green TP LED will be off If you power up the switch and the LED results are different from those listed above contact Alcatel Customer Support personnel for assistanc...

Страница 8: ...PC or workstation equipped with terminal emulation soft ware You will use this connection to enter initial configuration values on the switch 2 Access your Terminal Emulation Software Use your compute...

Страница 9: ...he switch before it has completed initial ization or processing a previous command Wait for the switch to initialize before entering any commands a Enter admin at the login prompt and press Enter The...

Страница 10: ...t provides full access to all switch management functions The factory default password for the admin account is switch Use the following procedure to change the password for the admin account a Type p...

Страница 11: ...ple below system time 11 53 19 New time 11 53 19 c To view the system date enter system date at the CLI prompt and press Enter The system date will be displayed as shown here system date 06 11 02 d To...

Страница 12: ...contact at the CLI prompt and press Enter c To view the system name type system name at the CLI prompt and press Enter If no name has been specified the following will display system name Unset d To...

Страница 13: ...le to specify Engineering 2 as the system description type the following at the CLI prompt and press Enter system description Engineering 2 Important Notes Any text string name that includes spaces mu...

Страница 14: ...To modify Group IP routing parameters complete the following steps a To assign or modify the default Group and VLAN Address type the following at the CLI prompt and press Enter group 1 router ip ip ad...

Страница 15: ...ded twisted pair STP cable to connect to a device Each OA 512 chassis provides twelve Port LEDs Refer to page 15 for detailed information on LED functions Each OA 512 chassis provides four Management...

Страница 16: ...nds CONSOLE represents Slot 1 and contains the equivalent of a management module The UI refers to the management module as the MPM The slot reserved for the OA 512 s VoIP uplink is labeled S4 for Slot...

Страница 17: ...l is reserved for use with a compression encryption SIMM OA 512 HWE A compression encryption SIMM is required to run Virtual Private network VPN software AC Power Connector Plug the sup plied AC power...

Страница 18: ...are Status This LED blinks Green when software has successfully load ed and the switch is ready to execute com mands It blinks Amber when the switch is in a transitional state such as when it first bo...

Страница 19: ...e without notice Contact your local Alcatel representative for the most current information Copyright 2003 Alcatel Internetworking Inc All rights reserved This document may not be reproduced in whole...

Отзывы: