
Installing the Wire-Form Cable Guides
90
7750 SR-a4 and SR-a8 Installation Guide
Guides are normally installed after the chassis is mounted in a rack. For EIA racks, you must
remove two of the four rack-mount screws completely, then re-use the screws to mount the
guides to the chassis and the chassis to the rack. If ETSI brackets are used, you can install the
guides with the adapter brackets before you mount the chassis in the rack.
Required tools:
•
a torque driver for the cable guide screws. Refer to the rack manufacturer’s
documentation for instructions.
•
EIA rack screws (not supplied), or 12-24 screws supplied with the ETSI adapter
brackets
To install the wire-form cable guides:
Step 1.
Remove the screws in holes 1 and 3 on the left side of the chassis flange.
Step 2.
Orient the cable guide so the mounting eyelets are pointing toward the chassis, as
indicated in
.
Step 3.
Replace and tighten the two screws. Refer to the rack manufacturer’s
documentation for instructions. See
Torque Specifications for Rack Mounting on
for more information.
Step 4.
Remove the screws in holes 2 and 4 on the right side of the chassis flange.
Step 5.
Orient the cable guide so the mounting eyelets are pointing toward the chassis, as
indicated in
.
Step 6.
Replace and tighten the two screws. Refer to the rack manufacturer’s
documentation for instructions. See
Torque Specifications for Rack Mounting on
for more information.
Note:
When routing cables to the sides of the chassis, the egress cables may impede the
removal and replacement of the fan on the left or the air filter on the right. For this reason,
left mounting the cable guide may be the preferred option, because the air filter must be
removed frequently for inspection.
Содержание 7750 SR-a4
Страница 8: ...Table of Contents 8 7750 SR a4 and SR a8 Installation Guide...
Страница 12: ...List of Tables 12 7750 SR a4 and SR a8 Installation Guide...
Страница 16: ...List of Figures 16 7750 SR a4 and SR a8 Installation Guide...
Страница 22: ...Technical Support 22 7750 SR a4 and SR a8 Installation Guide...
Страница 70: ...Safety Standards Compliance Agency Certifications 70 7750 SR a4 and SR a8 Installation Guide...
Страница 122: ...Managing Cable Connections to MDA a and MDA aXP Cards 122 7750 SR a4 and SR a8 Installation Guide...
Страница 136: ...Troubleshooting Initial Startup 136 7750 SR a4 and SR a8 Installation Guide...
Страница 170: ...44 port 1GigE CSFP SFP MDA a Overview 170 7750 SR a4 and SR a8 Installation Guide...
Страница 210: ...Removing and Replacing an Impedance Panel 210 7750 SR a4 and SR a8 Installation Guide...
Страница 230: ...Installation and Replacement of Pluggable Transceivers 230 7750 SR a4 and SR a8 Installation Guide...
Страница 232: ...2015 Alcatel Lucent All rights reserved 3HE 10231 AAAA TQZZA Edition 01...