
Powering Up, Initializing, and Configuring
7750 SR-a4 and SR-a8 Installation Guide
127
Step 1.
To initiate the boot process, plug the male end of the power cord into a 3-terminal,
single-phase power source that provides power within the acceptable range, as
described in
Step 2.
Check that the LED on each PSU is green. A green LED indicates that the AC
standby and main power supply outputs are operating within specification. If the
LED is off, there is no power input. Refer to
for more information.
To power-up a DC powered system:
Step 1.
Turn on the power at the remote power sources to initiate the boot process.
Step 2.
Check that the LED on each PSU is green. A green LED indicates that the DC
standby and main power supply outputs are operating within specification. If the
LED is off, there is no power input. Refer to
for more information.
Component LED Verification
To verify that the components power up correctly:
Step 1.
Verify that the system is initializing.
The system searches the CF card on the CPM for the
boot.ldr
file (also known
as the bootstrap or boot loader file).
The Status LED on the CPM-a slowly blinks green during initialization.
After initialization (approximately 30 s), the Status LED on the active CPM turns
solid green to indicate that the CPM boot/load process is complete and that the
CPM-a is operational as the primary CPM.
The Status LED on the inactive secondary CPM-a rapidly blinks green to indicate
that the CPM-a boot/load process is complete and that the CPM-a is operational as
the secondary CPM-a.
If the LEDs do not operate as described above, or if they blink and turn off, refer to
Troubleshooting Initial Startup on page 134
.
Step 2.
Verify the operational status of the router components by checking all the LEDs on
the CPM-a, IOM-a, fan tray and MDA-a components.
Refer to
Appendix A: Connectors and LEDs on page 137
and
a and MDA-aXP Card Descriptions on page 147
for more information.
Содержание 7750 SR-a4
Страница 8: ...Table of Contents 8 7750 SR a4 and SR a8 Installation Guide...
Страница 12: ...List of Tables 12 7750 SR a4 and SR a8 Installation Guide...
Страница 16: ...List of Figures 16 7750 SR a4 and SR a8 Installation Guide...
Страница 22: ...Technical Support 22 7750 SR a4 and SR a8 Installation Guide...
Страница 70: ...Safety Standards Compliance Agency Certifications 70 7750 SR a4 and SR a8 Installation Guide...
Страница 122: ...Managing Cable Connections to MDA a and MDA aXP Cards 122 7750 SR a4 and SR a8 Installation Guide...
Страница 136: ...Troubleshooting Initial Startup 136 7750 SR a4 and SR a8 Installation Guide...
Страница 170: ...44 port 1GigE CSFP SFP MDA a Overview 170 7750 SR a4 and SR a8 Installation Guide...
Страница 210: ...Removing and Replacing an Impedance Panel 210 7750 SR a4 and SR a8 Installation Guide...
Страница 230: ...Installation and Replacement of Pluggable Transceivers 230 7750 SR a4 and SR a8 Installation Guide...
Страница 232: ...2015 Alcatel Lucent All rights reserved 3HE 10231 AAAA TQZZA Edition 01...