Site Preparation
7705 SAR-A Chassis Installation Guide
65
•
Is the rating and capacity adequate for the space?
•
Is there proper drainage of water from the dehumidifier?
Is backup power generation located in a separate area from the
communications equipment?
Are batteries located in a separate area from the communications
equipment?
Is the equipment located above the water grade?
Are there adequate water drainage and leak controls?
Is there protection present to prevent entry of insects, pests, and
vermin?
Table 12: Specific Characteristics of the Installation Site (Continued)
Characteristic
Yes
No
Содержание 7705 SAR-A
Страница 23: ...Mandatory Regulations 7705 SAR A Chassis Installation Guide 23 Figure 3 Earth ground 9718 ...
Страница 66: ...Installation Site Assessment 66 7705 SAR A Chassis Installation Guide ...
Страница 76: ...Chassis Ground Wiring 76 7705 SAR A Chassis Installation Guide ...
Страница 82: ...Wiring and Connecting DC Power 82 7705 SAR A Chassis Installation Guide ...
Страница 132: ...7705 SAR A Ports 132 7705 SAR A Chassis Installation Guide ...
Страница 154: ... 2015 Alcatel Lucent All rights reserved 3HE 10141 AAAB TQZZA Edition 01 ...