Warnings and Notes
48
7705 SAR-A Chassis Installation Guide
Caution:
On the variant equipped with T1/E1 ports, when a T1/E1 port that is configured for
T1 is connected to external equipment or is in physical loopback, ensure that the external
equipment’s transmit signal is attenuated according to the distance of the T1/E1 port
receiver. Adjust LBO settings such that the T1/E1 port receiver’s nominal input voltage level
is < 3Vp. Refer to “Configuring T1 Line Buildout” in the 7705 SAR OS Interface
Configuration Guide for detailed information on attenuating transmit signals.
Note:
•
Prepare the equipment rack and site before installing the 7705 SAR-A chassis. Plan the
chassis placement near the power sources and network interface connections.
•
The 7705 SAR-A chassis weighs approximately 6.8 lbs (3.1 kg).
•
Always install the heaviest equipment on the bottom of the rack to keep the center of
gravity of the equipment rack as low as possible.
•
The 7705 SAR-A chassis includes factory-installed, rack-mounting brackets for
mounting in a 19-inch equipment rack.
Содержание 7705 SAR-A
Страница 23: ...Mandatory Regulations 7705 SAR A Chassis Installation Guide 23 Figure 3 Earth ground 9718 ...
Страница 66: ...Installation Site Assessment 66 7705 SAR A Chassis Installation Guide ...
Страница 76: ...Chassis Ground Wiring 76 7705 SAR A Chassis Installation Guide ...
Страница 82: ...Wiring and Connecting DC Power 82 7705 SAR A Chassis Installation Guide ...
Страница 132: ...7705 SAR A Ports 132 7705 SAR A Chassis Installation Guide ...
Страница 154: ... 2015 Alcatel Lucent All rights reserved 3HE 10141 AAAB TQZZA Edition 01 ...