1.4 GENERAL OPERATING INSTRUCTIONS
F301
1) Drive up to the bale and fully open the arms.
2) Drive in until the bale is up against the frame with the arms in the position shown below.
3) Operate the hydraulics to gently squeeze the bale.
4) Lift the bale and crowd so the bale is supported by the back frame.
DO NOT LIFT ANY
BALES WHICH ARE UNSUPPORTED THE SUPPORTING BACK FRAME.
5) Before moving ensure the desired path is clear. Only ever travel in a path which is
known to be clear and never allow the bales and handler to come within 10m of a
bystander.
6) To place the load position the bales very close to the destination before returning the
bales to horizontal to prevent bales tipping off prematurely. Gently place down the bales
and when the load is taken by the floor/trailer/other bales, release the hydraulics, lower
the attachment and reverse out gently. If the bales begin to move adjust attachment
position as necessary to prevent dragging. Do not drop the bale from any height, this may
result in personal injury or damage to the bale.
www.albutt.com | 01242 620 252 | [email protected]
Содержание F301
Страница 12: ...2 0 F410 PARTS DRAWING 2017 www albutt com 01242 620 252 keith albutt co uk...
Страница 13: ...2 1 F352 PARTS DRAWING 2018 www albutt com 01242 620 252 keith albutt co uk...
Страница 14: ...2 2 F450 PARTS DRAWING 2014 www albutt com 01242 620 252 keith albutt co uk...
Страница 15: ...2 3 F301 PARTS DRAWING 2017 www albutt com 01242 620 252 keith albutt co uk...