background image

INSTRUCTION MANUAL  

AND 

PARTS CATALOGUE  

FOR 

 
 

ALBUTT BALE HANDLERS 

(SQUEEZE VERSIONS) 

 

THIS MUST BE USED IN CONJUNCTION WITH  THE 

ALBUTT GENERAL OPERATOR’S MANUAL 

 

www.albutt.com | 01242 620 252 | [email protected] 

Содержание F301

Страница 1: ...STRUCTION MANUAL AND PARTS CATALOGUE FOR ALBUTT BALE HANDLERS SQUEEZE VERSIONS THIS MUST BE USED IN CONJUNCTION WITH THE ALBUTT GENERAL OPERATOR S MANUAL www albutt com 01242 620 252 keith albutt co u...

Страница 2: ...CONTENTS Certificate 3 Safety Instructions 4 6 Capabilities 7 Operating Instructions 8 9 Hydraulic Safety 10 Parts Diagrams 11 14 www albutt com 01242 620 252 keith albutt co uk...

Страница 3: ...ted Great Washbourne Tewkesbury Glos UK GL20 7AR declare in sole responsibility that the product Type F301 F352 F410 F450 to which this certificate applies conforms to the basic safety and health requ...

Страница 4: ...ccess platform 1 1 FUNDAMENTAL PRECAUTIONS On delivery your dealer gave you an explanation of the operation and maintenance of this Albutt attachment Please read and understand these operating instruc...

Страница 5: ...th the attachment Always use the correct mounting bracket and ensure that it is fitted by a trained and competent operator who has been approved by your Albutt dealer It is recommended to use a bolted...

Страница 6: ...well away from the moving parts ENSURE the implement and bales do not restrict the forward vision or important sightlines of the operator when mounted on the front of the tractor ENSURE that the opera...

Страница 7: ...ndling bale sizes in cm widthxheight www albutt com 01242 620 252 keith albutt co uk HANDLER QTY ROUND QTY 80x90 QTY 120x90 QTY 120x70 QTY 80x70 QTY 80x50 QTY 120x120 F301 1 N A N A N A N A N A N A F3...

Страница 8: ...path which is known to be clear and never allow the bales and handler to come within 10m of a bystander 6 To place the load position the bales very close to the destination before returning the bales...

Страница 9: ...sition the bale very close to the destination before returning the bale to horizontal to prevent bale tipping off prematurely Gently place down the bale and when the load is taken by the floor trailer...

Страница 10: ...clear Only ever travel in a path which is known to be clear and never allow the bales and handler to come within 10m of a bystander 5 To place the load position the bale very close to the destination...

Страница 11: ...leak stop the tractor flow immediately DO NOT PUT HANDS NEAR A LEAKING PIPE 1 6 MAINTENANCE As a rule disengage the driving system and stop the engine prior to carrying out maintenance servicing clea...

Страница 12: ...2 0 F410 PARTS DRAWING 2017 www albutt com 01242 620 252 keith albutt co uk...

Страница 13: ...2 1 F352 PARTS DRAWING 2018 www albutt com 01242 620 252 keith albutt co uk...

Страница 14: ...2 2 F450 PARTS DRAWING 2014 www albutt com 01242 620 252 keith albutt co uk...

Страница 15: ...2 3 F301 PARTS DRAWING 2017 www albutt com 01242 620 252 keith albutt co uk...

Отзывы: