SAM
™
SMART NOZZLE N
2
P
INSTALLATION, OPERATING, AND MAINTENANCE INSTRUCTIONS
PHONE: 800.228.1161
www.akronbrass.com
Sheet: 128570
Revision 06/28/2022
Page: 7 of 34
process. Upon detecting the
SAM™ SMART NOZZLE radio in the truck the SAM™ SMART NOZZLE will
begin the process of synchronization between the two devices. The LEDs on the
SAM™ SMART NOZZLE
will toggle while displaying the color green as shown below.
At the completion of the sync process the LEDs will display a successful sync or a failed sync attempt. Two
green flashing LEDs denote a successful sync process and the
SAM™ SMART NOZZLE is now in
communication with the radio on the
SAM™ truck. Two yellow flashing LEDs denote a failed sync process.
If the sync process fails, after the flashing yellow LEDs, the display will revert back to the pre-sync state
when the battery was first installed. Repeat the sync process again if needed to complete a successful
sync.
If a passing sync process cannot be completed contact Hale Technical Service (1-800-533-
for assistance.