8. Additional Refrigerant Charge
•
After the vacuum drying process is carried out, the
additional refrigerant charge process need to be
performed.
•
The outdoor unit is factory charged with refrigerant.
The additional refrigerant charge volume is decided
by the diameter and length of the liquid pipe be-
tween indoor and outdoor unit. Refer the following
formula to calculate the charge volume.
Diameter of liquid pipe (mm)
Formula
6.35
V=15g/m×(L-5)
9.52
V=30g/m×(L-5)
12.7
V=65g/m×(L-5)
V:
Additional refrigerant charge volume (g).
L :
The length of the liquid pipe (m).
Note:
•
Refrigerant may only be charged after performed
the vacuum drying process.
•
Always use gloves and glasses to protect your hands
and eyes during the charge work.
•
Use electronic scale or fluid infusion apparatus to
weight refrigerant to be recharged. Be sure to avoid
extra refrigerant charged, it may cause liquid ham-
mer of the compressor or protections.
•
Use supplementing flexible pipe to connect refriger-
ant cylinder, pressure gauge and outdoor unit. And
The refrigerant should be charged in liquid state.
Before recharging, The air in the flexible pipe and
manifold gauge should be exhausted.
•
After finished refrigerant recharge process, check
whether there is refrigerant leakage at the connec-
tion joint part.(Using gas leakage detector or soap
water to detect).
9. Engineering of Insulation
9.1 Insulation of refrigerant pipe
1. Operational procedure of refrigerant pipe
insulation
Cut the suitable pipe
→
insulation (except joint section)
→
flare the pipe
→
piping layout and connection
→
vacuum
drying
→
insulate the joint parts
2. Purpose of refrigerant pipe insulation
•
During operation, temperature of gas pipe and
liquid pipe shall be over-heating or over-cooling
extremely. Therefore, it is necessary to carry out in-
sulation; otherwise it shall debase the performance
of unit and burn compressor.
•
Gas pipe temperature is very low during cooling.
If insulation is not enough, it shall form dew and
cause leakage.
•
Temperature of gas pipe is very high (generally
50-100
℃
) during heating. Insulation work must be
carried out to prevent hurt by carelessness touching.
3. Insulation material selection for refrigerant pipe
•
The burning performance should over 120
℃
•
According to the local law to choose insulation
materials
•
The thickness of insulation layer shall be above
10mm.If in hot or wet environment place, the layer
of insulation should be thicker accordingly.
4. Installation highlights of insulation construction
•
Gas pipe and liquid pipe shall be insulated sepa-
rately, if the gas pipe and liquid pipe were insulated
together; it will decrease the performance of air
conditioner.
•
The insulation material at the joint pipe shall be
5~10cm longer than the gap of the insulation mate-
rial.
•
The insulation material at the joint pipe shall be
inserted into the gap of the insulation material.
•
The insulation material at the joint pipe shall be
banded to the gap pipe and liquid pipe tightly.
•
The linking part should be use glue to paste to-
gether
•
Be sure not bind the insulation material over-tight, it
may extrude out the air in the material to cause bad
Installation
Содержание YFAD-100R-01M25
Страница 15: ...Page 15 4 Centre of gravity 18K 24K...
Страница 16: ...Page 16 36K...
Страница 17: ...Page 17 48K 60K...
Страница 19: ...Page 19 DFMD 100N 01M25...
Страница 20: ...DFMD 100N 01T35 Page 20...
Страница 22: ...DFMD 160N 01M25 Page 22...
Страница 27: ...Page 27 YFAD 100R 01M25...
Страница 28: ...YFAD 100R 01T35 Page 28...
Страница 29: ...Page 29 YFAD 140R 01T35...
Страница 30: ...YFAD 160R 01T35 Page 30...
Страница 56: ...Page 56 11 Static Pressure 18K 24K...
Страница 57: ...Page 57 30K 36K 48K 60K...
Страница 93: ...Page 93 Design Static Pressure 3 Dynamic Losses For dynamic losses please refer to below image...
Страница 94: ...Page 94 Design Static Pressure 4 Corresponding Relation Between Rectangular Duct and Round Duct...