11
11
11
11
11
TRIO
High T
High T
High T
High T
High Tech
ech
ech
ech
ech
TRIO INSTALLATION
Minimum free clearances:
GROUND A
GROUND A
GROUND A
GROUND A
GROUND ATT
TT
TT
TT
TTA
AA
AACHMENT
CHMENT
CHMENT
CHMENT
CHMENT
On concrete slab with rubber pads supplied or PAULSTRA 521571 type vibration absorption
pads.
100
mm
500
mm
600
mm
200
mm
300
mm
705 mm
357 mm
Oblongs 13 x 10 (H8 screws)
CONDENSA
CONDENSA
CONDENSA
CONDENSA
CONDENSATE EV
TE EV
TE EV
TE EV
TE EVA
AA
AACU
CU
CU
CU
CUA
AA
AATION – DRAIN POSITIONING
TION – DRAIN POSITIONING
TION – DRAIN POSITIONING
TION – DRAIN POSITIONING
TION – DRAIN POSITIONING
To ensure effective condensate drainage, the drain pipe should be routed on a downward
slope of 2.5 cm/metre.
Adequate heat insulation for the condensate drain pipe should be provided for harsh
climates, or sub-zero temperatures.
Fit the drain pipe and its seal (supplied) if required, BEFORE attaching the unit to the ground.
For Heat pump models, in locations where the outdoors temperature may fall below 1°C, a
condensate anti-freezing protection device must be provided (a heated wrap for example).
When installing the unit in harsh climates, sub-zero temperatures, snow, or humidity it is
recommended that it is raised about 10 cm above ground level.
Содержание XLS12
Страница 2: ......