Page
2
of
5
2
X
2
X
15
X
Included with your Sealed Building:
Extra equipment needed in addition what is supplied with your inflatable:
Suitable 240v Power Supply to operate the fan
Extra equipment you could consider for your new inflatable:
Ground sheet to protect the underside of your inflatable
Sandbag covers to anchor your inflatable where anchors cannot be used
Sack truck to move your inflatable safely
RCD to attach to your extension lead
This inflatable can be set up and packed away by 2 persons who have
had proper manual handling training and uses the correct equipment
to move the inflatable.
Set up:
Please note the inflatable is packed in a way, that its end (or back) is rolled out first, and the
direction of rolling will usually show the direction the inflatable will face when inflated. This is
relevant, because some inflatables could represent a challenge to move or position them because
of their weight after they are unrolled/inflated.
-
Position the folded Sealed Building
in the desired place and direction.
-
Unroll and unfold.
PLEASE NOTE YOU WILL FIND THE INFLATION/DEFLATION VALVES
INSIDE THE UNIT, ON THE LOWER PARTS OF THE CORNER COLUMNS,
WHICH ARE ONLY ACCESIBLE THROUGH THE DOORS.
The inflatable
in its bag
Anchor Pegs
Door Nets
Webbing Straps
for routing cables
Ropes
Land Operation
Manual
Repair Kit