Version 1.0 17/02/17
Page
1
of
5
Sealed Building
IMPORTANT
AS OWNER/OPERATOR IT IS YOUR RESPONSIBILITY TO WRITE AND CARRY OUT
YOUR OWN RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT.
Site survey:
1. Carry out a survey of the area where the Sealed Building will be located, and check
for any overhead/underground cables. It’s important that this is carried out to avoid
ground anchors penetrating underground services, and the Sealed Building coming
into contact with overhead cables when inflated.
2. You should provide an adequate power supply to the fan, this should adhere to
your local power regulations.