12
Option:
Option:
Option:
J26
GND
J24
J23
J22
"J22"
"J26"
"GND"
"J24"
"J23"
2
1
3
4
5
1
1
2
1
2
21. Loosen the base plate containing the control box
and lower it to its bottom position.
22. Connect the front section wires (J22, J23, J26, GND)
and secure them at the control box.
23. Connect the front section wire (J24) and secure it
at the left section.
24. Lead the condensate drain hose (1) (option) above
the control box (2), through the cable strip (3) to
the side of the right section of the air handling unit.
NB! Do not bend the condensate drain hose!
25. Lead the condensate drain hose out of the front
section at the right top corner.
26. Pull the condensate drain hose (1) through the right
section of the air handling unit.
NB! Do not bend the condensate drain hose!
27. Use the hose connector (4) and the condensate
drain hose with 8mm/12mm diameter (5) (internal/
external diameter) to pull the condensate drain
hose to the wastewater system. See the manual
“Installation”.
28. Lift the base plate to its top position and secure it.
Содержание AM 1000
Страница 1: ...1 2 3 AM 1000 INSTALLATION...
Страница 4: ...4...