9
3.3.
Air Handling Unit
NB! The unit has to be leveled into a horizontal position.
1. Lift the centre section up to the wall frame, using
appropriate lifting equipment.
NB! When lifting the section a protective underlay must
be placed beneath the section to prevent scratches to
the section. This underlay may for example be strong,
clean cardboard or equivalent.
NB! Avoid damaging the profile in the middle of the
centre section.
2. Push the section against the wall frame and screw
securely to the frame using the bolts provided.
3. Mark and drill holes for the ceiling brackets.
NB! The drilling of holes, size of the holes and materials
used for fitting depend on the ceiling material and
the unit.
4. Fasten the ceiling brackets to the ceiling.
Содержание AM 1000
Страница 1: ...1 2 3 AM 1000 INSTALLATION...
Страница 4: ...4...