CAUTION
Please read all instructions prior to beginning installation. Use caution, improper
installation of door can cause severe injury or death. Door to be installed by qualified
personnel utilizing proper safety equipment.
STEP 1 - MEASURE DOOR OPENING AND FLOOR TO CEILING HEIGHT
The door tracks have been pre-cut at the factory to match ceiling measurements given to us at the time
of the order.
DO NOT CUT TRACKS WITHOUT CONSULTING THE FACTORY FIRST!! IF TRACKS
WILL NOT FIT OR YOU FEEL THEY NEED TO BE CUT, PLEASE CALL TECH SUPPORT AT
1-888-368-4403 BEFORE PROCEEDING.
STEP 2 - UNPACK HARDWARE
Unpack door and all hardware. Confirm all parts listed in the parts list have been included.
STEP 3 - DETERMINE LH & RH TRACKS
3-1: The left hand track will have the the bearing plate at the top and the brush seal pointed to the right
towards the center of the door opening.
3-2: The right hand track will have the bearing plate at the top and the brush seal pointed to the left
towards the center of the door opening.
3-3: For each track, the fastening portion of the track with the pre-drilled holes will be pointed away from
the door opening.
STEP 4 - MOUNT LEFT HAND TRACK
4-1: Place track against the wall so the stainless steel reset bracket is against the inside of the door jamb
and the brush seal is pointed towards the center of the opening. (FIG. 4A & 4B)
Stainless reset
bracket flush against
inside of door jamb.
FIG. 4A
FIG. 4B
1