Startup
3A4108F
11
7.
Set throttle to 50% setting to prime
sprayer.
8.
Turn pump switch to ON position.
9.
Increase pressure enough to start pump
stroking and allow fluid to circulate for 15
seconds; turn pressure down and turn
prime valve forward to SPRAY position.
10. Set throttle to desired setting.
11. Disengage spray gun trigger lock.
12. Hold gun against grounded metal
flushing pail. Trigger gun and increase
fluid pressure slowly until pump runs
smoothly.
Inspect fittings for leaks. Do not stop leaks
with your hand or a rag! If leaks occur, turn
sprayer OFF immediately. Perform
Pressure
Relief Procedure
steps 1-3, page 8. Tighten
leaky fittings. Repeat
Startup
procedure
steps 1-5. If no leaks, continue to trigger gun
until system is thoroughly flushed. Proceed to
step 6.
13. Place siphon tube in material pail.
14. Trigger gun again into flushing fluid pail
until material appears.
ti29211c
ON
15s
ti29101a
ti29211b
ti29102a
ti29103a
ti29104a
ti29105a
Содержание GS950
Страница 34: ...Notes 34 3A4108F Notes...