INSTALLATION INSTRUCTIONS AF200-007 - REV E
DATE 2/26/2015
Airfilm Camera Systems
Page
5
of
31
6245 Aerodrome Way Hangar No. 2
Georgetown, Ca 95634
5) Attach the cross tube assembly (A911) to the underbelly hard points Qty 2 located
under the forward landing gear cross tube. Use the following hardware to attach. SEE FIG
NO. 4
QTY
TYPE - NUMBER
ITEM
2
AN7-35A
HEX HEAD BOLTS
AR AN960-716L
WASHERS
4 AN365-720A
STOP
NUTS
Torque as per FAA AC43.13-1A 450- 500 In Lbs.
Fig No. 4
The cross-tube will self align to the proper angle of the hard points. Check that the existing
hardware is secure and for proper torque of 160-190 in lbs.