![Air Techniques MOJAVE LT3 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/air-techniques/mojave-lt3/mojave-lt3_user-and-installation-manual_2875588011.webp)
Page 11
Air Techniques, Inc.
Air Techniques, Inc.
Page 10
INSTALLATION
3 .
Drain to Facility Sewer Connection
. Refer to Figure 5, item (3) for the location of the Air/
Waster Separator drain . Use the 1-inch hose provided to connect the separator drain to the
facility sewer . As shown by Figure 6, the sewer connection can be made as either a closed
vented drain or open drain pipe method .
4 .
System Electrical Connections
. Refer to the Electrical Connections section (See Figure 7 .)
and connect the pump to 220V facility power . Refer to Figures 8 and 9 when connecting the low
power remote switch .
Figure 6. MOJAVE LT3 Detail Plumbing Connection
Drip Leg and
Exhaust Vent
Assembly
3
OR
Open Drain
Pipe
Closed Vented
Drain
Connection to
Facility Sewer
Drain
1" Drain Hose
Clamp
No
Hub
2
Heat Exhaust
Connection to
Outside Vent
1½" Schedule 40
Facility Vent Line
No
Hub
1/4-inch Vent
Condensation
Drain Port
Flex Tubing