AHU - HEALTH AND SAFETY REQUIREMENTS 

 
 
Manufacturers Responsibility 
 
Fan section access - 

All access doors allowing entry to the fan section are to be fitted 

with  one  lockable  door  handle  to  prevent  unauthorised  access.  Additionally  these 
doors are to display a suitable warning label.

 

Electric  Heater  access  - 

Non  lockable  lift  off  electric  heater  access  panels  are  to 

display a suitable electric warning label.

 

Specification  - 

Additional  safety  guards  and  features  (such  as  driveguard,  fan  inlet 

guards,  bulkhead  lights  etc.)  will  be  fitted  when  requested  in  the  specification  and 
included within our quotation.

 

Humidifiers  - 

Copper  steam  pipework  between  humidifiers  and  distribution  pipes 

where installed by ourselves will be lagged to prevent exposure of hot surfaces. When 
humidifier  steam  pipework  installation  is  not  carried  out  by  ourselves  it  is  the 
installers‟ responsibility to ensure correct lagging.

 

 
Installers Responsibility 
 
Installation  - 

Unless  otherwise  specified  by  ourselves  this  product  is  supplied  with 

the intention to be incorporated into other equipment or fitted into a ducted ventilation 
system  or  similar  suitable  application.  Some  installations  may  require  additional 
safety  parts  to  ensure  safe  operation.  For  example,  fan  fitted  at  the  end  of  a  ducted 
system with the inlet or outlet open exposing the impeller/motor to unguarded access. 
In this event the installer must fit a safety guard complying with current regulations.

 

Isolators  - 

Isolators  are  to  be  fitted  locally  to  all  fan  motors  and  other  electrical 

components of the AHU to allow safe working on the equipment.

 

Humidifiers - 

See “Humidifiers” section above.

 

 
End Users responsibility 
 

All AHU‟s are despatched with keys tied to door handles, it is the responsibility of the 
end user after hand-over to ensure that all keys are kept safe by a responsible person 
and only issued to authorised personnel. 

 

Содержание Envirofresh Series

Страница 1: ...ANCE INSTRUCTIONS FOR SERIES ENVIROFRESH AIR HANDLING UNITS CONTRACT No PROJECT REF AIR HANDLERS LIMITED Alfred Proctor House Bute Street Weaste Salford M50 1DU TEL 0161 745 8888 FAX 0161 925 9900 mai...

Страница 2: ...electric motor s the procedure as laid down in this manual is fully carried out The procedure for removing and replacing timing wedge belts and filter media bags or panels are fully carried out as la...

Страница 3: ...also essential for service and maintenance purposes and for the removal of the motor s INSTALLATION All units must be installed in accordance with good engineering standards upright and levels on a p...

Страница 4: ...ed to prevent damp and ingress of dust or foreign bodies and held in a dry store Fan Shaft Bearings Refer to Bearing damage in Cautionary Notes Bearings fitted with shields should not be stored for pe...

Страница 5: ...ation drive belts should be checked for tension and re tensioned if required Maintenance At least every 12 months a major inspection of the fan section should be carried out as follows Isolate electri...

Страница 6: ...motors are shipped with sufficient grease for a long operating period if relubrication is needed using a low pressure hand operated grease gun pump in clean recommended grease until the new grease app...

Страница 7: ...et the lower marker ring at the deflection distance required in mm on the lower scale Set the upper marker ring against the bottom edge of the tube Place the belt tension indicator on top of the belt...

Страница 8: ...n bends of the coil Damage to fins can be corrected by use of a fin comb available from Air Handlers all coils should be installed level and upright unless otherwise specified Care must be taken to en...

Страница 9: ...um breakers must be installed between the coil and the trap inlet to ensure that the hydraulic head drain the coil when it is at atmospheric or sub atmospheric pressure The vacuum breaker should respo...

Страница 10: ...ot twisted by ductwork and that fixings do not penetrate cog housing of the damper which will affect the damper mechanism Ductwork must be independently supported and should not be left to hang from t...

Страница 11: ...rried out This should generally be carried out at least every six months and a service inspection sheet issued to the customer upon completion Log books should be kept on site by the end user to prove...

Страница 12: ...pproval of AIR HANDLERS LIMITED Damage caused to equipment on site through lack of adequate protection from the elements or misuse by other trades Failure to observe all normally accepted engineering...

Страница 13: ...S manifold and compare them with the commissioning sheet If there is any significant variation then the fault should be found and corrected Refer to the troubleshooting chart If on inspection of the r...

Страница 14: ...k isolator mains supply Check settings Inspect fireman s panel Check actuator operation and end switch making when open Check control switch fuses MCB s and control circuit wiring Inspect drive belts...

Страница 15: ...mpressor section Check operation and settings Check operation and settings of the indoor frost protection stat Check fan runs on to dissipate heat prior to unit shut down Replace if faulty and reset h...

Страница 16: ...d control circuit wiring Step energised on controller Check air flow failure switches Check delay timer operation check controller timer operation Change compressor Check winding resistance replace co...

Страница 17: ...or internal leak Icing coil Low on refrigerant Indoor check valve leaking Outdoor check valve not fully open Icing coil Low on refrigerant 4 port valve not fully engaged or internal leak Outdoor chec...

Страница 18: ...it is the installers responsibility to ensure correct lagging Installers Responsibility Installation Unless otherwise specified by ourselves this product is supplied with the intention to be incorpor...

Отзывы: