15
Step one: choosing installation
location
Recommend the installation location to the
client and then confirm it with the client.
1.The pipe can be led out in the direction of
right, rear right, left or rear left.
Step two: install wall-mounting frame
1.Hang the wall-mounting frame on the wall;
adjust it in horizontal position with the level
meter and then point out the screw fixing
holes on the wall.
2.Drill the screw fixing holes on the wall with
impact drill (the specification of drill head
should be the same as the plastic expansion
particle) and then fill the plastic expansion
particles in the holes.
3.Fix the wall-mounting frame on the wall
with tapping screws (ST4.2X25TA) and then
check if the frame is firmly installed by
pulling the frame. If the plastic expansion
particle is loose, please drill another fixing
hole nearby.
Step three: open piping hole
1.Choose the position of piping hole according
to the direction of outlet pipe. The position
of piping hole should be a little lower than
the wall-mounted frame, shown as below.
2.Open a piping hole with the diameter of
φ
55 or
φ
70 on the selected outlet pipe
position.In order to drain smoothly, slant the
piping hole on the wall slightly downward to
the outdoor side with the gradient of 5-10°.
Left
Wall
55mm
Right
Mark in the middle of it
Level meter
Rear piping hole
Wall
Space
to the
wall
above
150mm
Space
to the
wall
above
150mm
55mm
Rear piping hole
Indoor
5-10
outdoor
55 or
70
Piping hole
Model
φ
55
Cooling capacity
<
6000W
φ
70
Cooling
capacity
≥
6000W
Note:
● Pay attention to dust prevention and take
relevant safety measures when opening the
hole.
● The plastic expansion particles are not
provided and should be bought locally.
Step four: outlet pipe
tf
e
l
rear left
right
t
h
g
ir
r
a
e
r
2.When selecting leading out the pipe from left
or right, please cut off the corresponding
hole on the bottom case.
cut off
the hole
left
right
Installation of indoor unit
Installation