19
7.8 Evacuation
Procedure:
1. Connect the vacuum pump to the charge set’s centre hose.
2. Evacuation for approximately one hour.
Confirm that the gauge needle has moved toward -0.1 Mpa (-76 cmHg) [vacuum of 4 mmHg or less].
3. Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge needle
does not move (approximately 5 minutes after turning off the vacuum pump).
4. Disconnect the charge hose from the vacuum pump.
Vacuum pump oil, if the vacuum pump oil becomes dirty or depleted, replenish as needle.
Содержание A17CI4C4M09
Страница 10: ...8 4 Specification Please see the special file about the specifications 5 Refrigerant cycle diagram Cooling only...
Страница 11: ...9 6 Wiring diagram 6 1 Indoor Unit MSC 09CRDN1 NR0 MSC 12CRDN1 NR0 MSC 18CRDN1 NQ0...
Страница 12: ...10 MSC 24CRDN1 NQ0W 6 2 Outdoor Unit MOA 09CDN1 NR0...
Страница 13: ...11 MOB 12CDN1 NR0...
Страница 14: ...12 MOC 18CDN1 NQ0...
Страница 35: ...33 K...