SITE PREPARATION
The
“
Two Pile System
”
For an efficient operation you would have two piles:
The
first pile
or
“
main debris
”
pile, is the material being generated from the land clear-
ing or forest clearing operation and is located away from the ember path but with good
access to your loading machinery.
The
second pile
or
“
Good Wood
”
pile is your best and most burnable wood. When
you first setup the site the operator should spend some time sorting through the main
debris pile pulling out what appears to be your best and most burnable materials. This
is the material you will start the fire with, this is the material that will give you a good
hot burning base fire. You will also draw from the
“
Good Wood
”
pile throughout the day
if you should need to stoke up the fire (more on this in the following sections).
As the FireBox operator is drawing from the main debris pile throughout the day he
should continue to replenish the
“
Good Wood
”
pile as necessary. The
“
Good Wood
”
pile only needs to be enough material to stoke
-
up the fire if needed and enough mate-
rial to get you started the next day.
DANGER:
You must insure debris does not build up on the machine. It
must be keep clean at all times during operation to prevent a fire that would
damage or destroy the engine and accessories.
IMPORTANT WARNING ABOUT BURNING OF PALLETS
Wooden Pallets, especially spent pallets burn extremely hot. DO NOT load
the FireBox above approximately 3/4 of the height of the burn chamber. Heat
damage to the manifold and other structure may occur which would not be
covered under your Limited Factory Warranty.