7
GETTING STARTED
APPENDIX
USING THE SYSTEM
(AT THE MASTER STATION)
USING THE SYSTEM
(AT A SUB STATION)
■
How to use the magnetic room and name plates
NOTES:
Use an oil-based pen (a grease marker) to fi ll in the plate.
•
When rewriting, be sure to remove the plate from the panel fi rst, and then wipe away the current contents with a soft cloth dampened with
•
rubbing alcohol. Do not use thinner.
Sub station
Bedside handheld sub station (NI-RC)
Room plate (included)
Write information (e.g. room
1
number) on the plate in the
corresponding positions.
Attach the plate on the
2
corresponding position.
Nameplate (included)
Write information (e.g. name) on
1
the plate.
Attach the plate on the
2
corresponding position.
Call button
Call button
Initiates a
call.
Call
indicator
(red)
Lights up
while calling
the master
station.
Microphone
RECEIVE VOL.
Adjusts the volume of
audio from the master
station to 3 levels (low/
mid/high).
Handle
Wall jack with hanger
for NI-RC (NIR-HPF)
Hanger
Hang the handle of
NI-RC here.
Speaker
Wall jack for NI-RC
(NIR-HP)
Attach the hanging
1
bracket to a side-rail of
bed with the screws
Hang the handle of the unit
2
on the hanging bracket.
Connect and fasten the
3
plug to a wall jack.
Screw x 2 (included)
Main unit
Hanging bracket (included)
Wall jack
* Only NIR-HP or NIR-HPF
is available.
* If NIR-HPF is used, the
hanging bracket may not
be needed.
■
Installing the bedside handheld sub station (NI-RC)
Cord: Approx. 1.5m (5')
Cord:
Approx. 1.4m (4.6')
NOTE:
If the call button has a cord, do not loop it around the bed
•
frame. It may become disconnected.
If the plug is not fastened securely, the cord may be
•
disconnected easily or it may cause a malfunction. Confi rm
that the plug is fastened to the jack securely once again.